- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
结算疑难问题详解23条(国外英语资料)
结算疑难问题详解23条(国外英文资料)
A detailed explanation of the problem of settlement is 23
1, after the completion of the project, party b according to the later changes of the construction drawing to do the clearing, settlement still adopt the way of the valuation, settlement price is 12 million yuan, plus 2 million yuan regarding the change (did not deal with completion of the project and the completion acceptance report, a lot of materials and workmanship change nor signature). Consulting company in this project audit settlement price is not in conformity with the contract price, according to party b and the settlement of the comprehensive unit price and bid and practice is not consistent, and construction drawing and tender drawings change is very big, is not conformity with the provisions of the bidding documents. Therefore, the decision is to be audited in a fixed and fixed way, and the settlement construction plan is recomputed, and the cost of the measures is recomputed. The price of the approved price is much lower than that of party b. Party b shall, on the basis of the listed price in the list, insist on the settlement of the list, and do not agree to adjust the combined unit price and measures. The two sides were at loggerheads and the talks stalled. How should such differences be judged?
A: the focus of this question is on whether to settle the settlement in a fixed price. Therefore, there is no sign when the parties confirm the fixed price settlement, if any price is correct. If not, the two parties will have to settle the settlement again.
When the bill is settled, the material price difference, the temporary valuation adjustment, and the contents of the list of items should be settled in accordance with the contract. Material price difference, temporarily valuation adjusted price can be executed by the contract, if the listing program including the content of the change, increase or decrease should be how to deal with? In addition, if party a stipulates that the
您可能关注的文档
最近下载
- 《时速160公里动力集中动车组构造与检修》 课件全套 1 绪论 ---16 电务车载.pptx
- 05 U1-U8语法精练 (含答案)2024-2025学年五年级英语上册期末专项复习(译林三起).docx
- 问题解决型QC报告.doc VIP
- 汽车线束介绍培训课件.pptx VIP
- 百度:智能体AI交互重构品牌营销.pptx VIP
- 2025至2030中国浸渍树脂市场发展规模与投资策略分析报告.docx VIP
- 百度_百度AI营销中级认证 _ 百度搜索百看怎么看?-2025.pdf VIP
- 中学生心理案例分析报告.docx VIP
- 精神科护理模拟考试题与答案.docx VIP
- 【轻质减负】第26课《诗词五首》情境化教学课件.pptx VIP
原创力文档


文档评论(0)