- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
造价员考试(国外英语资料)
造价员考试(国外英文资料)
Investment estimates for the planning phase ()
A plus or minus 20%
Plus or minus 30%
C p plus or minus 30%
D within + / - 30%
Investment estimation error rate () at the feasibility study stage ()
A plus or minus 10%
B plus or minus 20%
Plus or minus 20%
D within + / - 30%
The formulation method () of the construction project budget.
A budget method
B estimation method
C, materials, machine method
D insert method
The method of compiling the drawing budget is ()
A quantity list estimation method
The unit price method B
C real measure
D comprehensive engineering measure
The general price contract, the unit price contract and the cost plus remuneration contract are three broad categories, including the total price contract and the three types of the contract.
A fixed price contract, total price adjustment contract, total price contract of fixed quantity
B fixed, adjustable, cost plus fee
The total price of C can be adjusted, the unit price can be adjusted and the total price is settled
D: it is used for one-off, information price adjustment and design change adjustment
36, smaller and shorter, the contract type is chosen as ()
A is A one-off
Total price contract, unit price contract and cost plus remuneration contract
Fixed price of C
D is not suitable for total price contract
The deadline for the completion of the completion of the completion of the project, for the following items, shall be from the date of receipt of the completed settlement report and the completed settlement date ().
A14
B18
C20
D28
The main method of payment for the current project price in China is ()
A at
Monthly settlement
C quarterly settlement
D/o
The proportion of the project warranty (the tail) is usually ()
A3 %
B3 ~ 5%
C5 %
D10 %
The basic function of project guarantee is ()
A guarantee is completed on time
B, fast, good, save the task
C guarantees the implementation of contract performance and the guarantee of creditors rights
D risk conversion
31, C 32, B 33, A 34, B 35, A