3.施工部署(外国英语资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
3.施工部署(外国英语资料)

3.施工部署 3.1 part of the project construction sequence 3.1.1 Road Engineering (1) subgrade filling construction; (2) the construction order of subbase and subbase 3.1.2 Bridge Engineering (1) bored pile construction; (2) construction of platform (3) column construction; (4) coping construction (5) bridge erection; 3.2 construction flow section division and power arrangement 3.2.1 construction flow section division According to the engineering features of the project, the contents of the project, the construction conditions, and the principle of combining with the production flow to arrange the construction power. The specific flow sections are listed in table 3-1. 3.2.2 construction force arrangement (1) soft foundation treatment; Put in two construction teams, be responsible for the soft foundation treatment of this section. 4 sets of plate inserting machine and 1 diesel Vibrating Sinking machines are arranged, and other machines are matched by the ground engineering department. More than 50 constructors participated. (2) subgrade filling; Three construction teams are put in charge of the subgrade cleaning of the bid section. The construction tasks of Subgrade Earthwork and pulverized coal ash backfill are described. The construction team responsible for the first K22150 ~ K23980 operation period, the length of 1830m, 138 thousand cubic meters of earth. Equipped with self-propelled vibration compaction machine 1, three roller 3 Taiwan, 2 bulldozers, 1 grader, road mixing machine 1 sets, 1 sets of rotary excavator 3. Second in charge of the construction team K23980 ~ K24+446 section and Hutai interchange ramp, the route length of 1819m, 122 thousand cubic meters of earth. Equipped with self-propelled vibratory machine 1, three roller 3 Taiwan, 2 bulldozers, 1 sets of rotary excavator 1. Third construction team is responsible for K25+130 ~ K26+900 operation section, the length of 1770m, earthwork 210 thousand cubic meters. Equipped with self-propelled vibratory machin

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档