- 4
- 0
- 约 33页
- 2017-07-05 发布于河南
- 举报
单级直齿轮课程设计(国外英文资料)
单级直齿轮课程设计
I. transmission scheme
Second sets of third data: the design of belt conveyor in the first gear reducer
(1) working conditions: the service life is 10 years, each year according to 300 days calculation, two shifts system work, the load is steady.
(2) original data: cylinder circumferential force F=1.7KN; belt speed V=1.4m/s;
Roller diameter D=220mm.
kinematic sketch
Two, the choice of motor
1 、 motor type and structure type selection: according to the known working requirements and conditions, choose Y series three-phase asynchronous motor.
2, determine the power of the motor:
(1) the total efficiency of the transmission:
ETA = ETA with total * ETA 2 * * ETA ETA bearing gear coupling * ETA drum
=0.96 x 0.992 x 0.97 x 0.99 * 0.95
=0.86
(2) the work power required by the motor:
Pd=FV/1000 is the total
=1700 * 1.4/1000 * 0.86
=2.76KW
3, determine the motor speed:
Working speed of drum shaft:
Nw=60 * 1000V/ PI D
=60 * 1000 * 1.4/ pi * 220
=121.5r/min
According to [2] reasonable transmission table 2. 2 than the recommended range, V belt transmission ratio Iv=2~4, single gear transmission ratio range of Ic=3~5, then a reasonable transmission ratio range of I to i=6~20, the optional range of the motor speed is nd=i * nw= * 121.5=729~2430r/min (6~20)
The synchronous speed that meets this range is 960 r/min and 1420r/min. By 8.1 [table 2], three kinds of motor models are found, as follows
Motor type, rated power, motor speed (r/min), transmission ratio of transmission
KW same turn, full turn, total transmission ratio, with gear
1 Y132s-6 310009607.93 2.63
2 Y100l2-4 31500142011.683 3.89
Considering the size and weight of motor and transmission, the price and the transmission ratio of belt drive and reducer, the two schemes can be seen as follows: scheme 1, due to the low motor speed, larger transmission device and higher price. Program 2 moderate. Therefore, choose motor model Y100l2-4.
4, determine the motor type
According to the motor type selected above, the req
您可能关注的文档
最近下载
- 公章使用审批表1.doc VIP
- 津12G04 填充墙构造 DBJT29-18-2013图集-天津市工程建设标准设计图集电子版.pdf VIP
- 2.1-全国森林草原湿地荒漠化普查技术方案.pdf VIP
- 8篇2026班子成员民主生活会个人对照检查剖析发言(五个带头).docx VIP
- 07SG111-1 建筑结构加固施工图设计表示方法国标 建筑图集 汇编 .docx VIP
- 《MySQL数据库技术及应用项目教程》教学PPT(共9单元)项目1 MySQL数据库环境的建立.ppt VIP
- 8.2 甲状腺功能亢进症 课件(共42张PPT)- 《临床医学概要》同步教学(人卫版).ppt VIP
- T_ZKJXX 00036—2023_地面移动式三维激光扫描系统通用技术要求.pdf VIP
- QSY 01027-2019 天然气回收乙烷技术指标.pdf VIP
- 《内部控制的评价》课件.pptx VIP
原创力文档

文档评论(0)