- 1、本文档共38页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PTR3 选择(PTR3 choice)
PTR3 选择(PTR3 choice)
Chapter ix theoretical examination questions
1. The incorrect description of the influence of ice on the aircraft is (C).
A. increasing friction resistance of aircraft;
B. Approach the stall Angle;
C. The lift decreases and the speed of stall decreases.
D. Displacement of lift center
2. In the influence of the icing on the aircraft system, the incorrect description is (B).
A. when the main control area of the aircraft does not clean up the pollution, the control surface will be frozen in the original position or its motion will be blocked.
B. The landing gear will be damaged when the freeze is not removed. But the accumulation of snow/snow on the landing gear and deflection poles does not damage the aircraft;
C. it will provide the wrong information when the external sensor probe or hole in the aircraft or the front or near area of the aircraft is contaminated
D. the sealing ring of the gate and the cargo hold doors will cause the aircraft to be damaged or damaged when it is left with water vapor or ice.
3. The key parts of ice, snow and frost are not allowed in the exterior.
A. fuselage;
B. wing front and surface;
C. Horizontal tail surfaces;
D. Landing gear.
The correct description of time is (B)
A. keep time to begin with the first application of ice - proof ice - proofing, and end the failure of ice - resistant liquid on the aircraft.
B. Keep time to begin with the last application of ice - proof ice - proofing, and end the failure of ice - resistant liquid on the aircraft.
C. keep time to begin with the first application of ice - proofing the end of ice - proof liquid, end of the time when the ice - resistant liquid is applied on the aircraft.
D. keep time to begin with the last application of ice - proofing the end of the ice - resistant liquid, which ends in the time when the ice - de-icing fluid applied on the aircraft is ineffective.
5. Maintenance personnel and crew members must check the aircraft except ice/anti-ice, and its main insp
您可能关注的文档
- 7度辅助石阁脚本(7 degree auxiliary stone cabinet script).doc
- 6B泵工司机(6B pump driver).doc
- 7篇400字寒假日记(Seven 400 word diary).doc
- 800个有趣句子-8(800 funny sentences - 8).doc
- 7.23事故救援还原(7.23 accident relief reduction).doc
- 86-实验 探究加速度与物体质量、物体受力的关系(86 - the relationship between the acceleration and the mass and the force of the object).doc
- 80c51水箱控制系统(80c51 water tank control system).doc
- 8A汽油机使用手册(8A gasoline engine use manual).doc
- 8大设计风格(8 design style).doc
- 8文艺复兴(8 Renaissance).doc
- 金融产品2024年投资策略报告:积极适应市场风格,行为金融+机器学习新发现.pdf
- 交运物流2024年度投资策略:转型十字路,峰回路又转(2023120317).pdf
- 建材行业2024年投资策略报告:板块持续磨底,重点关注需求侧复苏.pdf
- 宏观2024年投资策略报告:复苏之路.pdf
- 光储氢2024年投资策略报告:复苏在春季,需求的非线性增长曙光初现.pdf
- 公用环保2024年投资策略报告:电改持续推进,火电盈利稳定性有望进一步提升.pdf
- 房地产2024年投资策略报告:聚焦三大工程,静待需求修复.pdf
- 保险2024年投资策略报告:资产负债匹配穿越利率周期.pdf
- 政策研究2024年宏观政策与经济形势展望:共识与分歧.pdf
- 有色金属行业2024年投资策略报告:新旧需求共振&工业原料受限,构筑有色大海星辰.pdf
文档评论(0)