中国石油北京《试油与试采》第三阶段在线作业(The third phase of China petroleum Beijing test oil and trial online homework).doc
- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国石油北京《试油与试采》第三阶段在线作业(The third phase of China petroleum Beijing test oil and trial online homework)
中国石油北京《试油与试采》第三阶段在线作业(The third phase of China petroleum Beijing test oil and trial online homework)
14 spring 13 autumn 13 spring China petroleum university petrochina Beijing - phase iii online homework
Single option
The first test and the navi pump drainage process, the conditions are applicable
A, gusher
B, a well with high oil viscosity
The liquid level of C and the well exceeds the 400m
D. rock is hard
The main purpose of the cable formation test is
A. Obtain the fluid samples under ground flow conditions
B. The production capacity of the oil and gas well is used for the development of the project design
C. Formation pressure and pressure response section of the target layer
D. Information of formation fault and oil-water boundary is obtained
The measured pressure curve of low yield and low permeability is characterized by:
The slope of the flow curve is low
B, the closed well curve is quick to indicate low permeability
C, the recovery curve is steep
D, the recovery curve will be flat in a short time
The flow phase of cable formation is mainly:
A, mainly radial flow
B, slug flow
C. Mist flow
D, dominated by spherical or hemispherical flows
The production technology of heavy oil test is divided into three types:
A, bailing
B, pump pumping fluid
C, gas lift
D. Liquid nitrogen drainage
The external factors influencing the stress and deformation of the test tube column, which is determined, include:
A, reservoir boundary
B. Static pressure
C, ground temperature
D. Fluid flow viscous force
When the test of hydrogen sulfide gas reservoir is tested, when it is tested for H2S, it should be:
A, open the sulfide gate and close the tester
B. Squeeze the liquid directly into the formation and return to the ground
C, close the sulfide gate and close the tester
D, open the sulfide gate and open the tester
The ground flow should be:
A, the use of sulfur-proof wellhead
B, use a conventional separator
C. Conventional wellhead device is adopted
D, direct discharge line
The gro
您可能关注的文档
- sql文本文档(SQL text document).doc
- SQL面试题四(SQL interview question 4).doc
- SOLIDWORKS常用的默认快捷键(SOLIDWORKS USES the default shortcut key).doc
- SQL面试(SQL interview).doc
- ssCAD(ssCAD).doc
- SS3型4000系高低压试验(SS3 type 4000 high voltage test).doc
- ssh学习过程中,遇到的问题及改正方法(Problems and correction methods encountered during SSH learning).doc
- stawe计算结果分析(Stawe computed the result analysis).doc
- SS将领培养(SS general training).doc
- STS软件中钢结构柱间支撑计算与施工图的绘制(Support calculation and construction drawing of steel structure pillar in STS software).doc
- 金融产品2024年投资策略报告:积极适应市场风格,行为金融+机器学习新发现.pdf
- 交运物流2024年度投资策略:转型十字路,峰回路又转(2023120317).pdf
- 建材行业2024年投资策略报告:板块持续磨底,重点关注需求侧复苏.pdf
- 宏观2024年投资策略报告:复苏之路.pdf
- 光储氢2024年投资策略报告:复苏在春季,需求的非线性增长曙光初现.pdf
- 公用环保2024年投资策略报告:电改持续推进,火电盈利稳定性有望进一步提升.pdf
- 房地产2024年投资策略报告:聚焦三大工程,静待需求修复.pdf
- 保险2024年投资策略报告:资产负债匹配穿越利率周期.pdf
- 政策研究2024年宏观政策与经济形势展望:共识与分歧.pdf
- 有色金属行业2024年投资策略报告:新旧需求共振&工业原料受限,构筑有色大海星辰.pdf
文档评论(0)