- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
故障处理实施细则(Implementation rules for failure handling)
故障处理实施细则(Implementation rules for failure handling)
The implementation rules of typical fault handling process of substation
1 scope
This standard provides specific rules for the typical fault processing flow of baoding power supply company substation.
This standard is applicable to the operation personnel of baoding power supply company and the operation personnel of the monitoring center in the case of equipment failure in substation.
Normative reference documents
Hebei southern power grid dispatch management code (2005) 49
Baoding (2009) baoding power grid dispatch management regulations
3 terms and definitions
The following terms and definitions apply to this standard.
3.1
A typical failure
It refers to the fault of main transformer, bus failure, line failure, total failure of substation and single phase ground fault of small current grounding system.
3.2
Small current grounding system
It refers to the ground system of the neutral system and the neutral point of neutral in 35kV and below.
3.3
Someone is on duty substation
It refers to the substation where the number of staff on duty is at least two and above, and responsible for the monitoring, operation and operation of the stations equipment.
4 the general
4.1 specification typical substation fault handling process, especially the unattended substation operation mode of processing procedure, and improve the fault processing speed, guarantee the safe and stable operation of power grid and equipment, formulate the detailed rules for the implementation.
The provisions of article 4.2 according to the relevant provisions of the state grid corporation and hebei province electric power company, combined with the baoding power supply company unattended substation centralized monitoring mode of operation and management of the actual situation.
The monitoring center, remote workstation and substation monitoring system should be remote, remote, remote, telemetry, remote viewing and complete information. The operation cla
您可能关注的文档
- 圣斗士144人出招表(The gladiator has a list of 144).doc
- 在单片机中锁相环功能(The function of phase-locked loop in single-chip microcomputer).doc
- 地下城主主观初期攻略(The subjective early stage of the underground city).doc
- 地下城炼金(Underground city alchemy).doc
- 地信考研(Letter to one's deceased father grind).doc
- 地下水回灌(Groundwater recharge).doc
- 地坪漆施工中的缺陷及处理方法(Defects and treatment methods in floor paint construction).doc
- 地域文化考试试卷_2(Regional culture exam paper _2).doc
- 地大地球科学概论试题(Geoscience overview of the earth).doc
- 地开发流程与计划管理(Develop process and plan management).doc
- 教BA炼金管理(Teach BA alchemy management).doc
- 教BA炼金(Teach the BA gold).doc
- 教你如何养护室内花卉(How do you maintain the indoor flowers).doc
- 教你如何铺地毯(How do you lay the carpet).doc
- 放射治疗学(radiotherapeutics).doc
- 教你如何构建蔬菜大棚 温室大棚 钢架大棚 无支柱大棚 中原温室工程(How do you construct the greenhouse greenhouse in the greenhouse greenhouse).doc
- 教师考试历年真题(The teacher's examination has been on the subject for years).doc
- 教学生学会(Student society).doc
- 教科版四年级科学上册总复习(The fourth grade science book review).doc
- 教育的本质何在敢问路在何方(What is the nature of education Dare to ask where the road is).doc
文档评论(0)