季节性施工的注意事项(Precautions for seasonal construction).docVIP

季节性施工的注意事项(Precautions for seasonal construction).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
季节性施工的注意事项(Precautions for seasonal construction)

季节性施工的注意事项(Precautions for seasonal construction) Precautions for seasonal construction After the rainstorm, typhoon, to inspect the site of the temporary facilities, as well as scaffolding, mechanical and electrical equipment, temporary power lines, that tilt, deformation, subsidence, leakage and leakage phenomenon, should be timely repair; there is a serious risk, should be immediately excluded. High-rise buildings and chimneys, towers and other high-rise structure construction, the steel scaffolding, large steel formwork and reinforcement engineering, metal operating platform and the use of cranes and other vertical transportation equipment, piling machinery and construction site storage of flammable and explosive goods warehouse, should be required to set the lightning protection device. Electrical switches for electromechanical equipment should be provided with rainproof and dampproof facilities. The construction site of the road, outdoor use of machinery and equipment, base, scaffolding foundation should have good drainage measures, and must be strengthened maintenance. Safe passage, scaffold ramps scaffold should have effective anti-skid measures. Summer work should adjust the work and rest time. Outdoor work should be avoided high temperature time, indoor high temperature workplaces and offices and dormitories, should be strengthened ventilation and cooling measures. Winter heating should be in line with fire requirements, designated special person responsible for the management, and carbon monoxide poisoning prevention measures. It is forbidden to burn open flame at the construction site, and electric stoves and lighting lamps are forbidden to be used for heating. Station to carry out the construction of high temperature protection measures in summer, strengthening construction safety education Station to carry out the construction of high temperature protection measures in summer, strengthening construction safety education Yi Wan company for the project c

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档