建筑工程案例汇编(Case study of Construction Engineering).docVIP

建筑工程案例汇编(Case study of Construction Engineering).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑工程案例汇编(Case study of Construction Engineering)

建筑工程案例汇编(Case study of Construction Engineering) This article is contributed by hezhihua86 DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Case history Case study of Construction Engineering 1, a project by A, B, C, D, E five sub projects, it is divided into four construction planes in the plane, the sub projects in each construction section of the water flow are 3 days. A, B construction process and B 2., a hotel building for the Hall part of the 16 layers, 13 wings, floor area of 11620m2, the main knot The structure of the middle hall is a frame shear structure, both wings are shear wall structure, the exterior wall board adopts large formwork residential common component, and the inner wall is C20 reinforced concrete. After the completion of the project, detected the following parts of the concrete strength is not up to the requirements: (1) seven layer of concrete wall of the 6 axes, 28 day test block strength 12.04N / mm2, 80 days later to take a set of concrete core wall, the compressive strength was 9.03N / mm2, 15N / mm2, 12.13. / 02N mm2; (2) the ten layer has 6 axes on the concrete wall column for 13.25N / mm2 block 28 days to 60 days after the strength of concrete core wall column group, the compressive strength was 10.08N / mm2, 11.66N / mm2, 12.26N / mm2, in addition to the insufficient concrete strength of this axis on the outside this layer, other members have similar problems. Question: (1) the cause of insufficient strength of concrete in the project may have? (2) in order to avoid the emergence of the strength of concrete engineering problems in the construction process of concrete pouring, which should meet the requirements? (3) in the examination of structure concrete strength, specimen sampling and detention should be consistent with what Notes: (1) the provisions? Answer: the reasons may be: the quality of raw materials of concrete does not m

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档