- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
交货采购(Delivery purchasing)
交货采购(Delivery purchasing)
Delivery purchasing
Delivery is the most important part of the purchasing operation. The purpose of the purchase is to obtain the goods, and delivery is the key to the completion of the purchase contract. The so-called delivery, generally refers to the transfer of ownership of goods, the transfer of the establishment, that is, the completion of delivery.
(1) the importance of ensuring delivery time;
Delivery date (delivery date) is the most important factor in delivery operation. Only when the goods are guaranteed can they be successful purchasing. The purpose of ensuring delivery is to obtain the supply of the goods required for production activities when necessary, so as to achieve production at the lowest cost.
The necessary time refers to the purchase time of the unplanned goods in order to achieve production activities at the lowest cost. Therefore, later than the time, of course, is not good, sooner than the time is not appropriate.
The reasons for the increase in cost resulting from late delivery and early delivery are described below:
1. delivery delay, will hinder the production activities of There is no hiding the fact. smoothly, will have an adverse effect on the production of tangible and intangible and relevant departments, as the increased cost and its main reasons, for:
(1) due to the delay of goods purchase, wait or delay caused occurrence of efficiency decrease.
(2) the delay in delivery of the goods, the loss of customers credit, resulting in a decrease in orders.
(3) for restitution (normal production), have to work overtime or holiday attendance, due to increased labor costs.
(4) the use of substitutes or low-quality materials may result in modifications or errors.
(5) the delay in the delivery of high frequency, speed up the operation cost increase.
(6) influencing the morale of employees.
2., the average person always thinks that early delivery is not too bad, in fact, early delivery will also increase costs. The follo
您可能关注的文档
- 局域网内有线路由器下接无线路由器方法(Method for wired wireless router to receive wireless router in local area network).doc
- 局域网组建与应用(LAN construction and Application).doc
- 局解问答题1(Question and answer 1).doc
- 局解名解(Local solution).doc
- 局域网时间同步(LAN time synchronization).doc
- 局解问题胸部(Problem chest).doc
- 局部解剖讨论题(Topical anatomical questions).doc
- 层次分析法(Analytic hierarchy process).doc
- 居安思危 常备不懈(Keep to the concept of all-time preparedness in).doc
- 局部解剖学1.doc
- 交通事故连带责任的法律规定(Legal provisions on joint and several liability for traffic accidents).doc
- 交通局书记科学发展观个人自查剖析材料(Traffic Bureau Secretary Scientific Outlook on Development personal self-examination analysis material).doc
- 交通法规制定程序规定(Provisions on the procedures for the formulation of traffic regulations).doc
- 交通违法行为代码表(Code of traffic violations).doc
- 交际原则与字幕翻译(Communicative principles and subtitling translation).doc
- 交集并集差集(Intersection union difference set).doc
- 产业整合资本的新通道(A new channel for industrial integration of capital).doc
- 产品的跟踪物料(Product tracking material).doc
- 产前准备(经验版)(Prenatal preparation (experience version)).doc
- 产品策划与运营策划的区别(The difference between product planning and operation planning).doc
文档评论(0)