兰大《土木工程施工》13春在线作业4(Lan Da, civil engineering construction, 13 spring online homework, 4).docVIP

兰大《土木工程施工》13春在线作业4(Lan Da, civil engineering construction, 13 spring online homework, 4).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
兰大《土木工程施工》13春在线作业4(Lan Da, civil engineering construction, 13 spring online homework, 4)

兰大《土木工程施工》13春在线作业4(Lan Da, civil engineering construction, 13 spring online homework, 4) 14 spring 13 autumn big blue civil engineering construction 13 spring online homework 4 Total score: 100 test time: - Radio examination A multiple-choice question Judgment question Radio examination questions (15 questions, 30 points). Radio) 1., unit construction organization design, cost reduction measures should be formulated () as a yardstick A. investment estimate B. design budget C. design budget D. construction budget Full marks: 2 2. the two nodes in the code network that have both an outward arrow and an inward arrow line are () A. start node B. end node C. intermediate node D. arbitrary node Full marks: 2 3. in speeding up the flow of beats, the running distance between any two adjacent professional teams is equal to the time in the flow rhythm A. maximum B. minimum C. common denominator D. minimum divisor Full marks: 2 4. building exterior plastering should choose () A. knife grey B. paper grey C. mixed sand operation answer did not upload, first for everyone to review the use, and if you need to answer the specific see my registration name to find pulp D. cement mortar Full marks: 2 5. when the masonry of the clay brick is constructed, the joint shall be staggered and the length of the joint shall be () A. 120mm B. 80mm C. 60mm D. 100mm Full marks: 2 The fracture of the pile is caused by the tensile stress generated by the reflected stress wave below the top of the 6. pile A. 1/3 B. 2/3 C. 1/4 D. 1/2 Full marks: 2 7. the wall should be arranged horizontally, when not horizontally arranged, and the lower end of the scaffolding connection connection, oblique angle of not more than (), shall not be used on cable connection A. 10 degrees B. 15 degrees C. 20 degrees D. 25 degrees Full marks: 2 8. the construction joint of the underground waterproof concrete shall be left on the wall, and shall be less than () the distance from the entrance to the wall A. 200mm B. 300mm C.

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档