广州市商品房销售面积委托预算指南(Guangzhou commercial housing sales area commissioned by the Budget Guide).doc

广州市商品房销售面积委托预算指南(Guangzhou commercial housing sales area commissioned by the Budget Guide).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
广州市商品房销售面积委托预算指南(Guangzhou commercial housing sales area commissioned by the Budget Guide)

广州市商品房销售面积委托预算指南(Guangzhou commercial housing sales area commissioned by the Budget Guide) Guangzhou commercial housing sales area commissioned by the Budget Guide I. initial budget (I) conditions of application Construction projects have not yet been completed and accepted. (two) application materials; 1. application for entrusted budget Certificate of attorney and power of attorney of the 2. units 3. housing construction approval documents (copy): (1) construction project planning permit; (2) report review submissions (3) list of building functional indexes; (4) general plan of 1:500; (5) record book of setting up survey of Guangzhou construction project; (6) the construction graph (flat vertical profile, drawing a copy or blueprint, and the corresponding.Dwg electronic files) (7) architectural design manual; 4. copies of the name of the project management authority of the city construction site 5. copies of the public security department number proof 6. unit number arrangement table or sketch map 7. other relevant instructions or documents needed in budget work (Note: if you submit a copy, you should provide original proof.) Two, change the budget (I) conditions of application 1. construction projects have not yet been completed and accepted; 2. construction project name, address, house number or planning conditions (including the number of households, unit size, floor number, floor area, total construction area and location), and the change of room number due to the change of planning conditions. (two) application materials; 1. commission to change the budget application 2. budget performance report before modification 3. if the planning conditions are changed, the planning department shall provide the supporting documents, maps, photocopies and electronic documents of the consent change 4. the name change of the construction project shall be provided with a copy of the certificate of the name of the construction site management department of the city 5. the add

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档