交通运输-白改黑城市道路改造技术探讨(Discussion on urban road reconstruction technology of white to black transportation).doc

交通运输-白改黑城市道路改造技术探讨(Discussion on urban road reconstruction technology of white to black transportation).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
交通运输-白改黑城市道路改造技术探讨(Discussion on urban road reconstruction technology of white to black transportation)

交通运输-白改黑城市道路改造技术探讨(Discussion on urban road reconstruction technology of white to black transportation) Discussion on urban road reconstruction technology of white to black transportation.Txt Abstract: the road white to black, that is, on the basis of the original cement concrete pavement, asphalt concrete surface layer, so that the original concrete rigid pavement into asphalt flexible pavement. In the construction of white to black, the treatment of cement concrete pavement as a roadbed and its related construction are very important to ensure the quality and practicability of the new paved asphalt concrete surface. This article unifies the Jinan city the first implementation of the white to black City Road, seven road (Luoyuan Street) reconstruction project, summarizes the improvement of the key points of design and construction of similar projects. A seven road (Luoyuan Street) maintenance project overview Jinan city seven road (Luoyuan Street) as the main maintenance engineering in Jinan City, a total length of 5600 meters, which is about 4640 meters to fast track the cement concrete pavement for asphalt concrete pavement construction, the fast lane is 22 meters wide, transforming an area of 102080 square meters, designed for on base layer after treatment, spray emulsion heat 1.2KG/M2 asphalt, geotextile paving, 6 cm and 4 cm grain type asphalt concrete modified fine asphalt concrete. According to the construction site and construction requirements, the construction unit of the semi closed traffic mode, which closed between four lane pool construction until the cement concrete base puwan grain type, then closed on both sides of two lanes in the same construction, finally from 2 to 3 days when fully closed in the fast lane, the construction of the above the fine layer of modified asphalt concrete, effectively solve the closed construction and ensure traffic contradiction, control the project quality, speed up the construction progress. Two, the original cement c

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档