开工都需要(Start all need).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
开工都需要(Start all need)

开工都需要(Start all need) I copyright: Construction project construction permit handling procedures Preparation and handling conditions before application (1) the construction site has been basically with construction conditions; (2) for approval of the construction site; (3) in the city planning area construction projects, has been planning permits; (4) require the demolition, the demolition schedule to meet the construction requirements; (5) have been identified in construction enterprises; (6) to meet the related construction drawings design specifications; (7) have been handled in the quality supervision departments and safety supervision departments in charge of quality and safety supervision of the relevant registration procedures; (8) the construction funds have already been implemented, duration less than 1 years, funds shall not be less than the contract price of the project period is more than 50%; 1 years, the contract price of the project funds shall not be less than 30%. Apply (a) to submit materials: 1, the housing construction project, the applicant should submit the application materials as follows: (1) according to the provisions of fill and seal building construction permit application form in three copies; (2) a copy of the original and the construction project planning permit attachment; (3) (state owned land approval the land use certificate or a copy of the relevant approval documents); (4) the construction plan design document review the original notice; (5) the contract filing form issued by the construction bidding bidding management department; (6) issued by the management department of the tender bidding supervision contract filing form (shall be submitted in accordance with the law supervision of Engineering); (7) building the construction enterprise safety production management personnel safety assessment certificate (B, C) and on the ground, underground pipelines and buildings built (structure) data transfer (table AQ-A-2) original single (

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档