给水、除氧及其系统调试措施(Water supply, deaeration and its system commissioning measures).docVIP

给水、除氧及其系统调试措施(Water supply, deaeration and its system commissioning measures).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
给水、除氧及其系统调试措施(Water supply, deaeration and its system commissioning measures)

给水、除氧及其系统调试措施(Water supply, deaeration and its system commissioning measures) 1. purpose of compilation 1.1 in order to guide and regulate the commissioning of the system and equipment, and ensure that the system and equipment can be safely and normally put into operation, these measures are formulated. 1.2 check electrical, thermal protection interlock and signal device to make sure the operation is reliable. 1.3 check the operation of the equipment, check the performance of the system, find and eliminate the possible defects. 2. compilation basis 2.1 regulations for commissioning and commissioning of thermal power projects, 1996 edition 2.2 regulations for commissioning, commissioning and acceptance of thermal power construction projects, 2009 Edition 2.3, thermal power project adjustment, commissioning quality inspection and evaluation criteria, 1996 edition 2.4 technical specifications for construction and acceptance of electric power construction (section of steam turbine unit) DL 5011-92 2.5 thermodynamic system diagram 2.6 design drawings, manufacturers instructions and steam turbine operating procedures and other relevant information 3. debugging quality target In accordance with Ministry of transport quality inspection and evaluation standards of test of thermal power project adjustment (1996 edition) the requirements of the quality standard of relevant systems and equipment, all the test pass rate of 100%, excellent rate of over 90%, to meet the requirements of the units start. Professional debugging personnel, the key part of the quality of debugging key checks, control, found problems should be promptly reported to superiors, in order to coordinate the solution, to ensure the smooth start commissioning work. 4. system and main technical specifications 4.1 equipment and Systems Overview 4.1.1 feed pump: HGC5/9 feed pump, for constant speed type. The feed pump is a single shell, segmented and multistage centrifugal pump. The structure of the pump is horizo

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档