23057_1土石方(23057_1 earthwork).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
23057_1土石方(23057_1 earthwork)

23057_1土石方(23057_1 earthwork) Calculation of earthwork quantity (1) artificial earth and stone; 1, soil classification: considered by 6m within the manual excavation pit depth, geosyncline, quota. 2, artificial earthwork quota is prepared by dry soil, such as digging wet soil, multiplied by factor 1.18. The division of dry and wet soil shall be based on the geological survey data and the underground normal water level. The above normal water level is dry soil, and the following is wet soil. 3, the artificial hole pile quota is suitable for construction under the condition of safety protection measures. 4, manual excavation pile, the vertical way of transportation in the hole, according to manual consideration. If the depth is more than 12M, the amount of labor in 12m shall be multiplied by factor 1.3 and multiplied by factor 1.5 within 16m or less than 20m. In the same hole, when the soil type is different, calculated by the weight of the quota, if there is quicksand or silt, it will be dealt with separately. Weighted average slope factor: Sigma =h1/h+h2/h+h3/h Length of excavated slope: L=2* (outside L, 2 outside 1+L) -0.37*4 V=h3* (a+2c+ Sigma *h3) *L V=h2* (a+2c+, sigma, *h3*2+, sigma, *h2) *L V=h1*[(a+ Sigma *h3*2) + Sigma *h1]*L 5, manual excavation between the earth, according to the actual size of the excavation, excluding the volume of pile, artificial multiplied by factor 1.05. 6. The retaining plate is divided into dense support and sparse support, and the dense support refers to the full retaining plate. The thin support is the retaining plate of the interdigital partition. The spacing of the dilute supports in the gauge is conventionally considered. 7, in the excavation with earth retaining plate support, according to the actual excavation volume, multiplied by factor 1.20. 8, according to the corresponding quota, the excavation of the ditch and the earthwork of the foundation pit need to drain the surface water. 9. The work of leveling ground has been t

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档