- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程项目管理实例试卷(Example of engineering project management)
工程项目管理实例试卷(Example of engineering project management)
Example of engineering project management
I. radio questions
1, combined with this case, please explain the establishment of grading inspection system in safety management, excluding the following.
A, not detected
B and local detection
C, comprehensive testing
D and delamination detection
[correct answer] D
2 、 the following causes and consequences of PE earthing terminal defects are.
A, flexible cord or multi strand wire joint shall be connected without crimping copper ear
B, the same place, using different brands of switches, sockets, unsightly
C, no insulation sleeve (open nose) is not beautiful, and maintenance is not safe
D and core bolts show uneven length on both sides
[correct answer] C
3, routine means of deepening the design of construction drawings, mainly rely on () professional design and construction experience.
A, engineer
B, designer
C, construction manager
D and construction Coordinator
[correct answer] A
4, information management is mainly applied to ().
A and pre construction stage
B, decision making stage
C, preparation phase
D and post evaluation stage
[correct answer] A
5. The scope of application of information management in mechanical and electrical installation projects does not include.
A, human resource management
B, financial management
C, office automation
D, consulting management
[correct answer] D
6. Each signature document of power engineering has one corresponding code. The first one is the registered practice engineer, and the code is used to indicate the registered constructor.
A, A
B, B
C, C
D, G
[correct answer] C
7, most of the projects contracted in countries are at present.
A and parallel contract model
B, CM mode
C and EPC general contracting projects
D, DB mode
[correct answer] C
8, the implementation of engineering data () responsibility system.
A, project manager
B, technology leader
C, data clerk
D, engineering and technical personnel
[correct answer] B
9, the installa
您可能关注的文档
- 铅酸电池容量的影响因素.ppt
- 铝模具的常识和术语.doc
- 铰链四杆课件().ppt
- 铸造材料及其冶炼.doc
- 铱星工程机械简报4月.doc
- 链接预算 - 经验交流.ppt
- 销售技巧比赛问题(答案).doc
- 锅炉单元热量平衡部分运行.ppt
- 锅炉压力容器焊机试纸 - A.doc
- 铝板的特点.doc
- 工程项目管理试题精华(Project management, examination questions, essence).doc
- 巴士(贤旭控宝宝)(Bus (Xian Xu controls baby)).doc
- 海 港-2(Seaport -2).doc
- 海.中信红树湾(CITIC Mangrove Bay).doc
- 海南风景区介绍(Introduction of Hainan scenic spot).doc
- 海涅的诗(Henie's Poetry).doc
- 海贼王漫画总目录(One Piece comics catalog).doc
- 海陵区2006~2007第一学期期末考试(Hailing area 2006~2007 first semester final examination).doc
- 消防系统知识(Fire system knowledge).doc
- 润滑油 润滑油特点(Characteristics of lubricating oils).doc
文档评论(0)