电厂设备热工专业常见故障分析与处理(Analysis and treatment of common faults in thermal engineering specialty of power plant).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电厂设备热工专业常见故障分析与处理(Analysis and treatment of common faults in thermal engineering specialty of power plant)
电厂设备热工专业常见故障分析与处理(Analysis and treatment of common faults in thermal engineering specialty of power plant)
Analysis and treatment of common faults in thermal engineering specialty of power plant
1 、 sampling table pipe plugging
The pressure and differential pressure of the feeder in the coal mill, air preheater and other parts are directly sampled by the pressure pipe, and the blockage of the sampling meter often appears.
Failure phenomenon: the performance of the pressure is no change, differential pressure rise, the switch does not move, the pressure rise, differential pressure drop, etc..
Failure cause:
1)
Design defects: in the design phase, there is no sampling tube blowing device, and the sampling tube is often blocked by coal dust or ash. Although the design of the sampling tube purging device has been designed in the two stage, it has not been used properly. After this problem was found, the relevant personnel in the heat treatment room were contacted with the relevant blowing device, which was not approved. The main concern was that the operation and operation of the sweeping device would affect the operating conditions of the equipment.
2)
There is no buffer tank: there is no buffer tank at the sampling port.
3)
Purge is not complete: Tuodian a sampling design of coal mill as a sampling port with multiple devices, such as pressure, differential pressure, switches and other reasons, conditions, time and measures to purge, not completely all the sample line all clean and purge left hidden trouble
Disposal method: purging
Treatment effect: the two phase equipment is now the device after the problem, first blowing, and then sweep device for use, after the use of sweeping device, the number of sweeping significantly reduced. In case of minor repairs or overhaul, all the sampling tube completely purge after all sampling purging device is put into use, I believe there will be a great improvement. Limited to the equipment in the first phase, and now there is only
您可能关注的文档
- 马球汽油滤清器安装.doc
- 驱动功能参数.doc
- 驱动轴故障.doc
- 香港航空评论.ppt
- 驱动轴箱分析.doc
- 驱动轴路设计.doc
- 驱动轴2(轴和轴壳).ppt
- 风道设计选择(格力).ppt
- 驾驶判断问题库.doc
- 驾驶六驾驶安全知识.ppt
- 电器英文翻译(Electrical appliance English translation).doc
- 电子书格式原版-煤矿企业安全生产管理人员考试题库2007年版国家题库中国矿业大学一通三防_三、多选题(The original e-book format - management of exam questions in China University of Mining and Technology 2007 edition of the national coal mine safety produ.doc
- 电子原理(Electronic principle).doc
- 电子书格式原版-煤矿企业安全生产管理人员考试题库2007年版国家题库中国矿业大学第二部分 安全管理 二、单(E-book format original - coal mine enterprise safety production management examination questions database, 2007 edition of the National Title Library.doc
- 电子技术专业词汇(Glossary of electronic technology).doc
- 电子零件基础培训材料(Basic training materials for electronic components).doc
- 电子设计从零开始(Electronic design starts from scratch).doc
- 电子管应用领域的思考(新版)(Thinking on the application field of electronic tubes (New Edition)).doc
- 电容2(Capacitance 2).doc
- 电容十说(Capacitor ten says).doc
文档评论(0)