碾压混凝土施工作业指导书(Guidelines for construction work of roller compacted concrete).docVIP

碾压混凝土施工作业指导书(Guidelines for construction work of roller compacted concrete).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
碾压混凝土施工作业指导书(Guidelines for construction work of roller compacted concrete)

碾压混凝土施工作业指导书(Guidelines for construction work of roller compacted concrete) Guidelines for construction work of roller compacted concrete This article is contributed by leexp988 Roller compacted concrete construction work instruction, roller compacted concrete construction work instruction book work 1, RCC construction process flow chart, RCC construction process flow chart Go down to the next floor Sampling VC value Surface cleaning Paving mortar Loading unloading Close a position Rolling Crack Seam treatment Inspection; apparent density transportation; automobile washing; heterogeneous concrete; vibration 2 RCC operation method and requirements of the 2.1 deck opening before cleaning, the surface of the concrete with high pressure water than 30MPa scouring, the floating on the surface of the skin, pulp, milk residue and dirt and loose adhesive aggregate all clean. 2.2 construction of roller compacted concrete RCC 2.2.1 transport the dump truck to transport concrete, road transport must be neat, dump truck tire to warehousing, clean, and prevent dirt, water barn, roller compacted concrete placing Road, with the width of 5~7m and the length is not less than 100m of the gravel road, away from the storehouse mouth 30~40m 30m dewatering plate or cleaning the pool, the water surface after removal of the vehicle tire completely after dehydration is allowed to enter inside the warehouse. The speed control in less than 5km/h dehydration pavement. In the car on the surface of the car, to avoid sudden braking, sharp bend and other damage to the quality of the concrete surface operations. When transporting concrete by belt conveyor, measures should be taken to reduce aggregate separation, to reduce mortar loss, to set up sun shading and rainproof facilities, and separation devices shall be provided at the discharge end. Belt conveyor should choose a larger groove angle. The negative pressure trough (pipe) transportation of concrete, should be in the negative pressure trough (

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档