- 1、本文档共43页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
7. DESIGN AND PERFORMANCE OF DIAMOND (7所示。)
Storms, M.A., Batiza, R., et al., 1993
Proceedings of the Ocean Drilling Program, Initial Reports, Vol. 142
7. DESIGN AND PERFORMANCE OF DIAMOND AND ROLLER-CONE BITS 1
G.L. Holloway2
EXECUTIVE SUMMARY Five different manufacturers contributed to developing drill bits
for Leg 142. Even though a considerable amount of effort was put
Several new styles of drill bits were designed for the nested drill-in into the design of the new bits, it was recognized that the drill bits
bottom-hole assemblies (DI-BHA) deployed during Ocean Drilling were possibly the weakest link of the DI-BHA hardware. Experience
Program (ODP) Leg 142 at the East Pacific Rise (EPR). The nested from Legs 106 and 109 provided some guidance; however, the bits
DI-BHA required the primary stage collars to have a 7-3/8-in. designed for Leg 142 presented an added complexity in that they not
(18.3 cm) bore and the secondary stage drill collars to have a 4.125-in. only needed to hold up to the rigors of hard-rock drilling but had to
(10.5 cm) bore. Center bits were designed in conjunction with both bit be designed with large open centers to allow a nested casing string
sizes to remove the core as the outer bits were drilled to depth. Two clearance to pass. Discussion of the characteristics of each bit, along
sizes of primary stage DI-BHA bits were manufactured: a 12-1/2-in. with field
您可能关注的文档
- 313R-97 Commentary on Standard Practice for (313 r - 97评论标准实践).pdf
- 317 - International Society for Photogrammetry (317年国际摄影测量学会).pdf
- 3.2.x Sutherland Potential - Royal Holloway, (3.2。).pdf
- 360-Degree Assessment - OPM.gov(360度评估OPM.gov).pdf
- 388A567 Solar Installation PV150 Operating (388 a567太阳能安装PV150操作).pdf
- 3a An Overview of ProE.ppt - Mechanical (3证明的概述。).pdf
- 350 EXC-F USA - Holeshot KTM(350年EXC-F - Holeshot KTM此次将为美国).pdf
- 3CPL Speed Lathe Manual - Crozier Machine Tool(3石油测井速度车床手册-牧杖机床).pdf
- 3D Geometrical Transformations - Brandeis(3 d几何转换-布兰代斯).pdf
- 3D CAD Guide for Machine Designers - EGS India(3 d CAD设计师EGS印度指导机器).pdf
最近下载
- 7《短歌行》《归园田居(其一)》 对比联读 教学设计 2024-2025学年统编版高中语文必修上册.docx
- 沪教版 七年级(上)数学 秋季课程 第4讲 整式的乘法(解析版).doc VIP
- 2024年萍乡卫生职业学院单招职业适应性测试模拟试题及答案解析.docx
- 生物 生命活动的主要承担者——蛋白质 专题练习.doc VIP
- 《摩登时代》-公开课件(设计).ppt VIP
- A7-10-制冷系统部件的检修.pdf
- Unit 2 I think that mooncakes are delicious! Section A(Grammar Focus-4c) 课件-九上英语.pptx VIP
- 2024年萍乡卫生职业学院单招职业技能测试题库及答案解析.docx VIP
- 父母借用子女名义购房协议书.doc
- 团体操花球串词.doc
文档评论(0)