- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
AC Drives and Safety circuits - ab(交流驱动器和安全电路ab)
Application Note
Interfacing AC Drives with Safety Relays
Purpose
• The intent of this document is to provide typical examples of how to interface AC Drives with
safety relays. This document will not describe machine guarding safety or risk assessment, which
are covered in our safety business documentation.
References
• NFPA79, Electrical Standards for Industrial Machinery
• EN954-1, Safety of Machinery – safety related parts of a control system – Part 1. General
Principles for Design
Stop Categories
• Stop Category 0 – Coast. Immediate removal of power to the motor. With immediate removal of
power to the motor, the motor will coast to stop. The time required to stop motion is dependent on
the load inertia and speed as well as the friction in the mechanical power transmission equipment
used in the system.
• Stop Category 1 – Controlled. Controlled Stop then removal of power to the motor. A ramp to stop
will be used to control the mechanical power transmission to rest then power is removed from the
motor. The time required to bring the mechanical system to rest is dependent upon load inertia
and speed as well as the regenerative dissipation capacity of the drive.
Component Descriptions
• Gate Interlock - The Trojan gate interlock uses direct opening contacts. When the gate is
opened, the contacts in the interlock are forced open by non-resilient components (e.g., not by
springs). A redundant (two) set of double break contacts are designed to ensure that at least one
signal is sent to the safety relay, when the gate is opened.
• E-Stop - When the E-Stop button is pressed the safety function is activated (Drive goes to safe
state). When a contactor is used it is opened by the E-Stop circuit. The E-sto
您可能关注的文档
- A simple spectrophotometric method for the (一个简单的光谱光度测量的方法).pdf
- A Structured VHDL Design Method - Gaisler(一个结构化的硬件描述语言(VHDL)设计方法Gaisler公司).pdf
- A STUDY OF CASTING CHARACTERISTICS FOR “ (研究铸造特点u201C).pdf
- A Study Of Distortion In Hot Stamping Process - (失真的研究在烫印过程中,).pdf
- A study of turbocharged Diesel engine during (涡轮增压柴油机的研究在).PDF
- A Study of Using Critical Chain Project (研究使用关键链项目).pdf
- A Study on Anasysis and Fabrication of an Ice (Anasysis研究和制造的冰).pdf
- A Study of Automotive Gear Lubes - (汽车齿轮润滑油的研究- - - - - -).pdf
- A Study on Package Stacking Process for ... - (研究包叠加过程).pdf
- A Study on Emotional Maturity Among Arranged (研究情感成熟度之间的安排).pdf
- 人教版九年级英语全一册单元速记•巧练Unit13【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit9【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit11【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit14【单元测试·提升卷】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit8【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit4【单元测试·提升卷】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit13【单元测试·基础卷】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit7【速记清单】(原卷版+解析).docx
- 苏教版五年级上册数学分层作业设计 2.2 三角形的面积(附答案).docx
- 人教版九年级英语全一册单元速记•巧练Unit12【单元测试·基础卷】(原卷版+解析).docx
最近下载
- 空调主机吊装方案.docx
- 基层儿科医务人员服务能力提升学习班答案-2024华医网继续教育答案.docx VIP
- 部编 人教版小学二年级上册语文教学课件 5.课文 14.我要的是葫芦 .pptx VIP
- 让“工具包”理念和方法落地.pdf VIP
- 国家开放大学《可编程控制器应用实训》形考任务2(实训二)参考答案.docx
- 4.2 实现中华民族伟大复兴的中国梦 课件(18张PPT)-2023-2024学年高中政治统编版必修一中国特色社会主义.pptx VIP
- 费森尤斯CRRT操作流程.doc VIP
- 五年级上册英语期中试卷人教精通版.pdf VIP
- 第17课昆明的雨(课件)(共27张PPT).pptx VIP
- 小学信息技术(信息科技)第六册泰山版(2018)合集.docx
文档评论(0)