- 42
- 0
- 约1.86万字
- 约 15页
- 2017-07-29 发布于河南
- 举报
自动化专业英语教程翻译3.3(Automation English course translation 3.3)
自动化专业英语教程翻译3.3(Automation English course translation 3.3)
A PLC overview
The automation of many different process control systems, such as the control of production machinery or the production line of a factory, is accomplished by a minicomputer called a programmable logic controller (PLC). In 1968, General Motors pioneered PLC and applied it to the automotive industry, and developed the first PLC project using an electronic controller instead of a hard wired relay system.
With the emergence of PLC, the centralization of plant process control, especially in the automotive industry, has been greatly improved.
PLC architecture
PLC is a diskless compact computer that contains all the software and hardware necessary for process control. They are commonly used for automatic control applications (such as closed loop control), which can exist independently, and can also be connected to distributed I/O, other PLC or monitoring computers. These connections are built via fieldbus, such as WorldFIP, PROFIBUS, or Ethernet.
Typical PLC contains:
Power Supply
Program running CPU
Input / output module
Optional communication module
Many electrical interfaces can be supported with the IO module:
The simulation module (+ / - 10V + / - 1V, 4-20mA, resistance, etc.)
Temperature measurements (PT100, Ni, 100, etc.)
The digital module (220V + / - 24V, etc.)
TTL module (Beckhoff, I/O module, etc.)
RS 232 module
Other
These modules can be connected to the internal bus of the PLC, and can also be connected through the bus connector and the field bus unit (such as PROFIBUS, WorldFIP, or, CAN), and share the bus on other PLC.
The users hardware is hard to connect directly to the PLC internal bus. The solution is to integrate user hardware using standard interface cards (such as HMSs AnyBus card) as standard fieldbus interfaces (such as PROFIBUS, CAN, and, WorldFIP).
Now, PLC provides Ethernet based communications. Although based on TCP/IP and IEEE 802.2, each vendors PLC protocol is different.
您可能关注的文档
- 有杆抽油系统工况分析(Analysis of working conditions of sucker rod pumping system).doc
- 最终幻想3流程(Final Fantasy 3 process).doc
- 最近的新闻评论192(Recent news review 192).doc
- 有机硅胶及其设备(Organic silica gel and equipment thereof).doc
- 有限单元法及程序设计(Finite element method and program design).doc
- 服务器常用端口大全(Server common port Daquan).doc
- 服务器的一些简介(Some brief introduction of server).doc
- 服务质量差距(Service quality gap).doc
- 期末地理复习题刚(Final geography review just now).doc
- 服务失败的顾客归因及其启示(Customer attribution of service failure and Its Implications).doc
- 广东省广州省实验中学教育集团2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州大学附属中学2025-2026学年八年级上学期奥班期中物理试题(解析版).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(含答案).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(解析版).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 2026《中国人寿上海分公司营销员培训体系优化研究》18000字.docx
- 《生物探究性实验教学》中小学教师资格模拟试题.docx
原创力文档

文档评论(0)