夏季混凝土施工技术交底(Concrete construction techniques in summer).docVIP

  • 9
  • 0
  • 约7.7千字
  • 约 7页
  • 2017-08-03 发布于河南
  • 举报

夏季混凝土施工技术交底(Concrete construction techniques in summer).doc

夏季混凝土施工技术交底(Concrete construction techniques in summer) Due to high summer temperatures, evaporation of water, fast drying, the slump loss of concrete, a new concrete possible condensation speed, strength reduction phenomenon, and will create many cracks and other phenomena, thus affecting the quality of the concrete structure itself, for this must take some effective measures, from the aspects of concrete the mixing, transportation, concrete pouring and curing repair and strengthen the control to guarantee the quality of concrete construction with the construction specification and design requirements. I. mixing and transportation of concrete In order to control the outlet temperature of concrete, concrete mixing measures should be taken to control the temperature rise of concrete and control additional water quantity at one time to reduce slump loss and reduce plastic shrinkage cracking. In the concrete mixing and transportation process, the following measures are taken. 1 、 the transportation distance of concrete mixture is longer, so the setting time of concrete can be controlled by retarder, but attention should be paid to the dosage of retarder, especially for large area concrete project. 2, for high concrete slump, high efficiency water reducing agent can be considered. By mixing superplasticizer, the slump of the concrete mixture is longer and the superplasticizer can reduce the friction between the aggregate particles and reduce the heat accumulation in the mixing barrel. 3, to the stack of water, reduce the temperature of concrete aggregate; if the condition with groundwater or well water spray, cooling effect is better, and often detect water content. 4, in the hot season or large volume concrete construction, use cold water to replace part of mixing water. The temperature, pouring temperature and pouring temperature of mass concrete mixture shall be monitored at least once every 2h. Concrete pump pipe can be covered with geotextiles and other water retai

文档评论(0)

1亿VIP精品文档

相关文档