网站大量收购独家精品文档,联系QQ:2885784924

混凝土浇筑方案 及注意事项(Concrete pouring scheme and precautions).doc

混凝土浇筑方案 及注意事项(Concrete pouring scheme and precautions).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
混凝土浇筑方案 及注意事项(Concrete pouring scheme and precautions) The concrete pump USES maintenance points Concrete pump truck has been used in the construction of concrete pouring, the advancement and the maintenance of the equipment technical complexity, determines the use, maintenance and management of it staff to put forward higher requirements. In order to ensure that the concrete pump can meet the required technical state, reduce the maintenance cost, improve the reliability and service life of the use, the maintenance procedures for its use must be carried out carefully. I. safe operation procedures In order to ensure the safety of the concrete pump operation and avoid causing personal or equipment accidents, the following safe operating procedures must be strictly observed. 1. Venue selection. Avoid obstacles such as high pressure lines as far as possible. 2. Check before homework. The power switch of the operating station should be in the off position; The displacement handle of the concrete displacement handle and stirring device shall be located in the middle part. 3. Leg operation. The concrete pump should be placed horizontally and the ground should be flat and solid, so that the working process will not be sunken. The legs can support the whole machine reliably and reliably. 4. Arm stand operation. When the arm frame is extended or withdrawn from folded state, it must be carried out in accordance with the specified order. The rotary operation of the arm frame must be carried out after the arm frame is completely left. The arm frame shall not be used when the storm condition or the wind has reached level 8 or above (wind speed of 16 ~ 17m/s). Arm frame must not be used for lifting. 5. Pumping operation. When the pump is started or stopped, contact the operator at the end of the hose; The bending radius of the end hose shall not be less than 1m, and no bending is allowed. Before disassembling the clogging pipe, the pump should be pumped 2 ~ 3 times before removing

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档