- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土路面施工工艺(Construction technology of concrete pavement)
The construction process for concrete pavement was viewed 83 times, and twice was returned to |
Construction technology of cement concrete pavement
1. Selection of raw materials
1.1. Purchase the goods in accordance with the requirements of the design.
1.2 bar
1.2.1. The varieties and specifications of the rebar conform to the design requirements, and comply with the relevant specification requirements (gb1499-98) (gb13013-91)
1.2.2. The steel bars are straight and surface clean, with no cracks, breaks and marks, and the surface is covered with oil and granular or flake rust to be cleaned.
1.2.3. The steel bar fracture must be polished.
1.3. Sliding sleeve
1.3.1. If the design is not required to be made from galvanized iron sheet or with hard plastic pipe with sufficient strength and multi-layer linoleum pipe, the specification meets the design requirements.
1.3.2. The casing shall not be deformed in the use of the casing, and the end shall be poured into the melted butter sawdust mixture.
1.4. Seam materials and seaming materials shall be carried out according to the design requirements.
2. Construction preparation
Before concrete paving, renovations to the grassroots, measure the width of the grassroots, road arch, elevation, roughness, strength and degree of compaction shall meet the requirements before construction, the surface should be water wetting at the grassroots level to avoid concrete moisture is at the bottom of the dry absorption at the grass-roots level.
3. Pavement construction
3.1. Measuring lofting
According to the design drawing, the center line of the route and the edge of the road are released; A temporary level is set on both sides of the route so that the road can be checked and checked in a high level during construction.
3.2. Support template
In the treatment of the base or a good leveling layer, clean up the sundries and floating soil, then set up the template, the height of the templa
您可能关注的文档
- 美西经典-黄石-羚羊彩穴-总统巨石 12天团[纳美旅游](A 12-day tour of the President's rock - the President's rock).doc
- 美学_自然美(Aesthetics _ natural beauty).doc
- 魅族组合键(Meizu key).doc
- 魔法化学九年级上6-2(Magic chemistry 9th grade 6-2).doc
- 魔鬼词典(Devil's dictionary).doc
- 魔力宝贝1级宠物坐标集(Magic baby 1 pet coordinate set).doc
- 魔兽争霸3多人地图《超越极限》通用攻略(Warcraft 3 multiplayer map beyond the limit general strategy).doc
- 魔塔v1.1攻略(Magic tower v1.1 attack).doc
- 脑出血患者的日常护理(Daily care for patients with cerebral hemorrhage).doc
- 鸟 迹 拳(Bird trace fist).doc
- 混凝土砌块收缩控制(Concrete block shrinkage control).doc
- 混凝土施工方案参考资料(Reference materials for concrete construction projects).doc
- 混凝土施工冷缝的预防及处理(Prevention and treatment of cold joint in concrete construction).doc
- 混凝土说dvdsgs打工撒法国萨达股份(The concrete says that DVDSGS works to saada).doc
- 混凝土有关资料(Concrete information).doc
- 火罐效果辨别和水泡处理(Fire can distinguish and blister treatment).doc
- 火焰之文章(Articles of fire).doc
- 激光加工应用技术基础知识(Basic knowledge of laser processing technology).doc
- 济南的公交车(Bus in jinan).doc
- 济南地区游玩指南(A guide to the jinan area).doc
文档评论(0)