建设工程造价管理(2013年版)修改(Construction project cost management (2013 edition) modification).doc

建设工程造价管理(2013年版)修改(Construction project cost management (2013 edition) modification).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建设工程造价管理(2013年版)修改(Construction project cost management (2013 edition) modification) Construction cost management (2013) ) modified This textbook combines the ministry of housing and urban-rural construction and the construction project cost project of the ministry of finance 44. Measures for the construction of construction projects and contract pricing of construction projects of the ministry of housing and urban-rural development (no. 16 of the ministry of construction), Construction project quantity list price specification gb50500-2013, as well as the subject development, made some modifications Several typographical errors were corrected. The original text has not been corrected. Please refer to the table below. The second penultimate line of the list of editors Xu yuanming of chongqing university wrote the fourth chapter Xu yuanming university of chongqing wrote chapter 4, chapter 6 Chapter 1 The characteristics of the project valuation are replaced by the characteristics of the project valuation in line 1 (2) Page 2 of FIG. 1.1.1 changes to P4 FIG. 1.1.1 (2) the cost of the estimate is changed to (2) the estimate of the project The revised cost of the revised estimate is changed to (3) revised estimates FIG. 1.1.1 the budget price of line 10 (4) is changed to (4) construction drawing budget FIG. 1.1.1 control of project cost at the first stage of line 12 ~ 13. Not every project should determine the budget cost. Currently, some engineering projects need to determine the tender control Price to limit the highest bid price. The modification is control of the project cost of the previous stage. At present, according to the current bill of quantities, some engineering projects need to determine the bidding control price to limit the maximum bid price. FIG. 1.1.1 (6) settlement price: refers to the acceptance stage of the completion of the project. Change to (6) intermediate settlement: refers to the construction process and completion acceptance stage The project

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档