桥梁选型(The bridge type selection).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥梁选型(The bridge type selection) (1) bridge layout #] Bridges are often built for crossing rivers, canyons or roads. The principle of [01] investment is huge and the large bridge is complex, and the comprehensive demonstration should be conducted from the aspects of geology, hydrology and wiring scheme, so as to seek a better bridge scheme. Standard [02] crossing a river is generally used to set a bridge; When a river, there are two or more than two stable channel, or the flow of the design flow of the volume of proportion is larger, and the water is not easy to merge, should set up a bridge, are not far apart, but if the two bridge connecting bridge condition, should be connected to a task. When a bridge crosses some undesirable geological area, a bridge should be established. It should follow the following guidelines: [3]. T rule [03] when the bridge passes through some undesirable geological areas, such as the ice vertebrae in the permafrost region, the frost heaving mound, the melting and freezing mud flow, the thermal flow slump, the hot flow lake and other undesirable geological areas, the bridge should be established. I, | w1 _ % h6 @ (ii) bridge span Bridge crossing is one of the main projects of bridge design. A complex bridge, not only must carry on the comparison between different bridge type scheme, and often to the same bridge across several different points for several different schemes are compared, for a better solution. The bridge subdivision generally follows the following guidelines: m. g; B/X; Rule of B + t [04] bridge span arrangement, in addition to meet the requirements of bridge function and other conditions, should make the total cost is low (long, of course, for different bridge should be compared with the subgrade). Generally speaking, the greater the difference in geology or the bigger the investment in the lower structure, the more suitable the larger span should be adopted to reduce the engineering quantity of the supporting structure,

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档