网站大量收购独家精品文档,联系QQ:2885784924

工程项目管理的wbs分解结构(Project management WBS decomposition structure).doc

工程项目管理的wbs分解结构(Project management WBS decomposition structure).doc

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程项目管理的wbs分解结构(Project management WBS decomposition structure) Project management WBS decomposition structure A signing the project management contract B project management C engineering drawing design C / 01 programme design C / 02 preliminary design C / 03 preliminary design approval C / 04 construction drawing design C / 04.01 construction drawing design C / 04.02 construction drawing audit C / 04.03 delivery drawings D handle project planning procedures D / 01 application for planning design scheme review notification Special approval of D / 02 (civil defense, fire, traffic, garden) A formal plan for the commencement of construction of the year D / 03 D / 04 application for construction project planning permit E handling construction work permit E / 01 to get start approval form E / 02 municipal supporting agreement E / 03 recruitment application form E / 04 bid approval procedures E / 05 general contracting contract operation E / 05.01 pre-qualification documents, preparation and submission of bidding documents E / 05.02 tender reserve meeting E / 05.03 tender documents Exploration site E / 05.04 E / 05.05 tender document preparation and submission E / 05.06 bid opening E / 05.07 organization bid unit defense, prepare bid evaluation report E / 05.08 calibration, issuing notice of bid E / 05.09 the general contracting contract is agreed upon and signed E / 05.10 general contracting contract for the record E / 06 supervision contract operation E / 06.01 qualification for tender examination E / 06.02 tender documents E / 06.03 survey site E / 06.04 tender document preparation and submission E / 06.05 bids E / 06.06 organization of bid unit defense, preparation of bid evaluation report E / 06.07 calibration, issuing notice of bid E / 06.08 supervision contract signing E / 06.09 supervision contract record E / 07 implementation supervision contract E / 07.01 project supervision outline review E / 07.02 supervision performance evaluation of project implementation pro

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档