工程项目管理实例试卷(Project management example test paper)
Project management example test paper
1. Topic selection
1. In the case of this case, please indicate that in the security management, the establishment of the system of grading inspection does not include the following ().
A. no detection
B. Local detection
C. Comprehensive detection
D. Stratified detection
D) D
2. The following reasons and consequences of the connection defects of the PE ground terminals are ().
A, soft wire or multi-strand wire joint connection does not press the copper ear
B, use different brand switch socket in the same place, not beautiful
C, no insulation sleeve (open nose) is not beautiful, and it is not safe when maintenance
D, the two sides of the cored bolts show different lengths
[correct answer] C
3. The design of the construction drawings is mainly depended on () professional design and construction experience.
A. engineer
B. Designer
C. Construction management personnel
D. Construction coordinator
A
4. Information management is mainly applied to ().
A. Pre-construction
B. Decision-making stage
C. Preparation stage
D, post-evaluation phase
A
5. The application scope of the information management of mechanical and electrical installation project is not included ().
A. Human resource management
B. financial management
C, office automation
D. Consulting management
D) D
6. Each of the signature documents of the power project has the corresponding code, the first code for the registered practitioner engineer category, and the letter () to represent the registered builder.
A, A,
B, B
C, C
D, G,
[correct answer] C
7. Most of the projects currently contracted in countries are ().
A. Parallel contracting mode
B. CM mode
C, EPC general contracting project
D, DB mode
[correct answer] C
8. The project data shall be implemented ().
A. project manager
B. Technical director
C. Reference
D. engineering technicians
[correct answer] B
9. The top of the casing installed in the floor shall be above the gro
您可能关注的文档
- 巴氏奶与普通奶的区别(The difference between buttermilk and regular milk).doc
- 巴勒斯坦旅游旅行攻略(Travel guide to Palestine).doc
- 帮你认字(To help you read).doc
- 巴西ncm 号码(Brazil NCM number).doc
- 帮助我们祛湿的食物(Help us eat clearing damp).doc
- 布法罗旅游指南 (buffalo guide) - 纽约州出境游指南 yododo 游多多(Buffalo guide - New York state travel guide yododo Tours).doc
- 布料机在水泥混凝土路面摊铺施工中的应用_石磊(Application of cloth machine in cement concrete pavement paving construction).doc
- 布料基本知识(Fabric basics).doc
- 布鲁氏菌病防治技术规范(Technical specification for brucellosis).doc
- 布什在林肯号航空母舰上的讲话(Bush's speech on the uss Abraham Lincoln).doc
最近下载
- LNG储配站安全工作手册.pdf
- JJG 853—2013 低本底α、β测量仪.pdf
- 铁路临近既有线施工安全防护专项方案[001].docx VIP
- 破络预处理-中和沉淀工艺处理含铜电镀废水.pdf VIP
- 北京市房山区2023-2024学年小升初语文试卷(含答案).docx VIP
- 2025年美丽中国第六届全国国家版图知识竞赛测试题库(中小学组).docx VIP
- 2022年幼儿园道路交通安全工作总结(10篇).doc VIP
- 全国公立医院运营管理业财融合30个典型案例汇编.pdf VIP
- 新概念英语(青少年)Starter A 全册笔记.pdf VIP
- 国家开放大学电大《人力资源管理》机考9套题库及答案.doc
文档评论(0)