网站大量收购独家精品文档,联系QQ:2885784924

工程项目管理实例试卷(Project management example test paper).doc

工程项目管理实例试卷(Project management example test paper).doc

  1. 1、本文档共41页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程项目管理实例试卷(Project management example test paper) Project management example test paper 1. Topic selection 1. In the case of this case, please indicate that in the security management, the establishment of the system of grading inspection does not include the following (). A. no detection B. Local detection C. Comprehensive detection D. Stratified detection D) D 2. The following reasons and consequences of the connection defects of the PE ground terminals are (). A, soft wire or multi-strand wire joint connection does not press the copper ear B, use different brand switch socket in the same place, not beautiful C, no insulation sleeve (open nose) is not beautiful, and it is not safe when maintenance D, the two sides of the cored bolts show different lengths [correct answer] C 3. The design of the construction drawings is mainly depended on () professional design and construction experience. A. engineer B. Designer C. Construction management personnel D. Construction coordinator A 4. Information management is mainly applied to (). A. Pre-construction B. Decision-making stage C. Preparation stage D, post-evaluation phase A 5. The application scope of the information management of mechanical and electrical installation project is not included (). A. Human resource management B. financial management C, office automation D. Consulting management D) D 6. Each of the signature documents of the power project has the corresponding code, the first code for the registered practitioner engineer category, and the letter () to represent the registered builder. A, A, B, B C, C D, G, [correct answer] C 7. Most of the projects currently contracted in countries are (). A. Parallel contracting mode B. CM mode C, EPC general contracting project D, DB mode [correct answer] C 8. The project data shall be implemented (). A. project manager B. Technical director C. Reference D. engineering technicians [correct answer] B 9. The top of the casing installed in the floor shall be above the gro

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档