网站大量收购独家精品文档,联系QQ:2885784924

屋面钢架施工组织设计_百度文库_20150527_093614(Design of roof steel frame construction organization _ baidu wenku _20150527_093614).doc

屋面钢架施工组织设计_百度文库_20150527_093614(Design of roof steel frame construction organization _ baidu wenku _20150527_093614).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
屋面钢架施工组织设计_百度文库093614(Design of roof steel frame construction organization _ baidu wenku 093614) Ikea, wuxi mall steel structure roofing project? ? ?????????????????????????????????????????????????????????????????????? 29?????????????????????? GMS, Shanghai general metal structure engineering co. LTD. 3.3 before lifting the roof beam, the flange of the beam should be fixed in the corresponding position. ? Before installing the roof beam, straighten the roof beam. Check the span and diagonal lines with a steel ruler, check the bending of the string with steel wire, and the Angle can not be broken in the straight line. The roof beam must be strengthened with cedar poles, and the 24m span above the roof adopts the four-point hoisting method. ? 3.5 when the roof beam is rolled over and changed in the way of placement, the cushion points should be stable and the side support should be firmly supported. ? 3.6 when the roof beams are in place, the roof beam is fixed in time and the roof purline is installed at no more than 6 meters. The support of the roof beam flange should also be fixed with the purline. ? 3.7 adjust the relatively independent rigid unit of the installation. After the adjustment is completed, tighten the roof and the slanting rod. ?? 4 installation of steel structure parts? 4.1 carefully check the size of the edge line, the type of various purline and the size of the socket between the purline. ? 4.2 the inconsistency of the purline hole position and the hole position of the large girder is not correct because of the error of the rechecking installation size, and the hole drilling is applied to the error. ? 4.3 installation purlin rod, tie rod opening direction should conform to the requirements of the drawings (generally for mouth to mouth), tie rod bending end must achieve vertical, tie rod after the installation is complete, whether should be visual whole in a straight line. ? ? ? ? ?????????????????????????????????????????????????

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档