住宅小区质量通病预防措施(Prevention measures on quality of residential quarters).docVIP

住宅小区质量通病预防措施(Prevention measures on quality of residential quarters).doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
住宅小区质量通病预防措施(Prevention measures on quality of residential quarters) A - 1 plot of sub-star residential residential area Quality preventive measures Tianyuan construction group co., LTD 501 projects department A - 1 plot of sub-star residential residential area Prevention and control measures for quality control I. preparation basis: 1. Procedure document of tianyuan construction group co., LTD. (project quality plan); 2. Construction drawings and related documents of the project; 3. Relevant regulations, construction standards and standards; Ii. Project overview Qingdao yaxing real estate co., LTD., A - 1 block south of the Yangtze river is located in Qingdao economic and technological development zone east road, north of binhai avenue area range, about 120 meters north and south the strengths, something the most strength of about 120 meters. The project is designed to provide an underground garage and a high-rise residential building in the garage. The top layer is the wrong layer design, which is 28 and 31 respectively. The total construction area is 31202 square meters. The construction unit for Qingdao yaxing real estate co., LTD., prospecting units for Qingdao ruiyuan engineering group co., LTD., survey and mapping institute, design units for Qingdao architectural design institute co., LTD. The height of the building is 93.4 m. The basic form is pile foundation and raft foundation. In total, there are two post-watering strips, which are divided into four areas. The high level of the project is reinforced concrete shear wall structure, exterior decoration exterior wall is coating, floor of floor is fine stone concrete, floor tile, cement mortar ground, interior wall brush paint. The filling wall is mostly reinforced concrete block, the thickness is 100, 200mm. Iii. Potential non-conformance and preventive measures of sub-item engineering (1) earthwork engineering: Precipitation is used to set clear drainage channel and blind ditch precipitation. The potential n

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档