- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
住宅小区质量通病预防措施(Prevention measures on quality of residential quarters)
A - 1 plot of sub-star residential residential area
Quality preventive measures
Tianyuan construction group co., LTD
501 projects department
A - 1 plot of sub-star residential residential area
Prevention and control measures for quality control
I. preparation basis:
1. Procedure document of tianyuan construction group co., LTD. (project quality plan);
2. Construction drawings and related documents of the project;
3. Relevant regulations, construction standards and standards;
Ii. Project overview
Qingdao yaxing real estate co., LTD., A - 1 block south of the Yangtze river is located in Qingdao economic and technological development zone east road, north of binhai avenue area range, about 120 meters north and south the strengths, something the most strength of about 120 meters. The project is designed to provide an underground garage and a high-rise residential building in the garage. The top layer is the wrong layer design, which is 28 and 31 respectively. The total construction area is 31202 square meters. The construction unit for Qingdao yaxing real estate co., LTD., prospecting units for Qingdao ruiyuan engineering group co., LTD., survey and mapping institute, design units for Qingdao architectural design institute co., LTD. The height of the building is 93.4 m. The basic form is pile foundation and raft foundation. In total, there are two post-watering strips, which are divided into four areas. The high level of the project is reinforced concrete shear wall structure, exterior decoration exterior wall is coating, floor of floor is fine stone concrete, floor tile, cement mortar ground, interior wall brush paint. The filling wall is mostly reinforced concrete block, the thickness is 100, 200mm.
Iii. Potential non-conformance and preventive measures of sub-item engineering
(1) earthwork engineering:
Precipitation is used to set clear drainage channel and blind ditch precipitation.
The potential n
您可能关注的文档
- 仓储单选(Warehousing radio).doc
- 仓库管理制度(Warehouse management system).doc
- 产品的跟踪物料(Product tracking materials).doc
- 产品介绍(Product introduction).doc
- 产品美学(Product aesthetics).doc
- 产品评估(Product evaluation).doc
- 产品示范(Product demonstration).doc
- 串口并口PCI 接口总结(Serial interface and PCI interface summary).doc
- 串行实时时钟芯片DS1302程序设计中的问题与对策(Problems and countermeasures of serial real-time clock chip DS1302 program design).doc
- 串口连接线制作方法(Method of serial connection).doc
- 2.1神经调节的结构基础 课件 人教版高中生物学选择性必修1.pptx
- 2.2.1算术平方根 课件 北师大版数学八年级上册.pptx
- 2.3.1细胞通过分裂而增殖 课件(内嵌视频3个)初中生物学北师大版(2024)七年级上册.pptx
- 2.3.2细胞分化形成组织 课件 初中生物学北师大版(2024)七年级上册.pptx
- 4.3.1 角与角的大小比较 课件 2025-2026学年湘教版数学七年级上册.pptx
- 2.3.3生物体的器官、系统 课件 初中生物学北师大版(2024)七年级上册.pptx
- 聚异氰酸酯行业商业计划书.docx
- 2.4节神经系统的分级调节 课件 人教版高中生物学选择性必修1.pptx
- 【公开课】探索勾股定理第1课时(课件)数学北师大版2024八年级上册.pptx
- 综合实践 一天的时间(课件)2025-2026学年度苏教版数学三年级上册.pptx
文档评论(0)