龙门架安装施工方案(Installation plan of Longmen shelf installation).doc

龙门架安装施工方案(Installation plan of Longmen shelf installation).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
龙门架安装施工方案(Installation plan of Longmen shelf installation) Installation plan of Longmen shelf installation A basis for the preparation of technical code for safety of Longmen JGJ88-92 frame material lifting, construction scaffolding safety technical specification of fastener type steel tube JGJB2001. construction safety inspection standards and mandatory provisions building JGJ59-99. Two, the general situation of the engineering and installation conditions of this project mainly plant ontology engineering, construction area of 29426m2. in the main workshop of D K0~K1, 7~8 column axis installation of a plane in Longmen, the main materials used in the steel plate, wall materials, transportation, installation height of 60m. Three. Installation of Longmen shelf 1, first check whether the foundation meets the specification requirements, Longmen frame foundation, should meet the following requirements: A, the bearing capacity of soil compaction should be not less than 80kPa.B, C30, 500mm.C, the thickness of concrete pouring base surface should be flat and horizontal deviation of not more than 10mm.D around, should have drainage measures, no water immersion foundation. 2, before installation, first check the Longmen frame rail straightness, parallelism, dislocation of rail docking point, the column after the installation requirements for inspection of verticality in two directions, the inclination should be guaranteed in less than 1.5 per thousand, not up to the standard, should adjust the pad in the bottom plug, until to meet the requirements so far. 3, place the ground beam, first assembled the ground pulley, and then connect the chassis, looking for a good level, fastening the anchor bolt. 4. Place the self lifting platform in place so that the center line of the jacket coincides with the center line of the column. 5. Put the standard section of the first set of columns in the jacket, and the bottom end is connected with the ground beam by bolts. 6 place the lifting pul

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档