- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
龙门架安装施工方案(Installation plan of Longmen shelf installation)
Installation plan of Longmen shelf installation
A basis for the preparation of technical code for safety of Longmen JGJ88-92 frame material lifting, construction scaffolding safety technical specification of fastener type steel tube JGJB2001. construction safety inspection standards and mandatory provisions building JGJ59-99.
Two, the general situation of the engineering and installation conditions of this project mainly plant ontology engineering, construction area of 29426m2. in the main workshop of D K0~K1, 7~8 column axis installation of a plane in Longmen, the main materials used in the steel plate, wall materials, transportation, installation height of 60m.
Three. Installation of Longmen shelf
1, first check whether the foundation meets the specification requirements, Longmen frame foundation, should meet the following requirements: A, the bearing capacity of soil compaction should be not less than 80kPa.B, C30, 500mm.C, the thickness of concrete pouring base surface should be flat and horizontal deviation of not more than 10mm.D around, should have drainage measures, no water immersion foundation.
2, before installation, first check the Longmen frame rail straightness, parallelism, dislocation of rail docking point, the column after the installation requirements for inspection of verticality in two directions, the inclination should be guaranteed in less than 1.5 per thousand, not up to the standard, should adjust the pad in the bottom plug, until to meet the requirements so far.
3, place the ground beam, first assembled the ground pulley, and then connect the chassis, looking for a good level, fastening the anchor bolt.
4. Place the self lifting platform in place so that the center line of the jacket coincides with the center line of the column.
5. Put the standard section of the first set of columns in the jacket, and the bottom end is connected with the ground beam by bolts.
6 place the lifting pul
您可能关注的文档
- 仓储单选(Warehousing radio).doc
- 仓库管理制度(Warehouse management system).doc
- 产品的跟踪物料(Product tracking materials).doc
- 产品介绍(Product introduction).doc
- 产品美学(Product aesthetics).doc
- 产品评估(Product evaluation).doc
- 产品示范(Product demonstration).doc
- 串口并口PCI 接口总结(Serial interface and PCI interface summary).doc
- 串行实时时钟芯片DS1302程序设计中的问题与对策(Problems and countermeasures of serial real-time clock chip DS1302 program design).doc
- 串口连接线制作方法(Method of serial connection).doc
- 3.2 学习成就梦想 课件(共27张PPT) 统编版道德与法治七年级上册(内嵌音频+视频).pptx
- 2.1.2植物细胞工程的应用课件(共32张PPT) 人教版选择性必修3(内嵌音频+视频).pptx
- 纲要上第3课 秦统一多民族封建国家的建立 课件(共19张PPT)(内嵌音频+视频).pptx
- 高中历史必修三课件第6课文艺复兴和宗教改革1(共44张PPT).ppt
- 课时5二次函数y=ax2bxc的图像与性质课件北师大版九年级数学下册.pptx
- 《宗教大学生信仰调查报告》.doc
- 信息必刷卷03(广州专用)(原卷版).docx
- 343实际问题与一元一次方程(三)球赛积分问题(分层作业).docx
- Unit2Animals核心单词课件高中英语上外版(2020)1_1.pptx
- 2.1.2植物细胞课件(共20张PPT)人教版生物七年级上册(内嵌音频+视频).pptx
最近下载
- 铁路机车运用管理系统规则(铁总运〔2025〕314号) .pdf VIP
- 河南交投集团招聘笔试真题.pdf
- 二年级数学下册期末无纸化测评PPT.pptx VIP
- 通化(2011)1403-I回流线架空地线安装图.pdf
- 2025年普法学法知识竞赛题库及参考答案【基础题】.docx VIP
- 2025年《植物生产技术》形考作业参考答案.pdf VIP
- DB51_T 3222-2024 电动汽车充电设施消防安全规范.pdf VIP
- 人教版(2024)新教材七年级音乐下册印在心中的歌《中国人民解放军军歌》精品教案.doc VIP
- 冠心病诊断与治疗指南.ppt VIP
- 医药公司温湿度监测系统更换专项内审(包括计划、检查记录、内审报告).pdf VIP
文档评论(0)