网站大量收购独家精品文档,联系QQ:2885784924

给排水设计基本程序与方法(Basic procedures and methods of water supply and drainage design).doc

给排水设计基本程序与方法(Basic procedures and methods of water supply and drainage design).doc

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
给排水设计基本程序与方法(Basic procedures and methods of water supply and drainage design) Water supply and drainage design of.Txt basic procedures and methods without painful wound bleeding, only smiling people sometimes give people the most simple advice is the most difficult. The basic procedures and methods of water supply and drainage design (design writeup) A working stage 1, design stage: The feasibility study report of the project proposal???? the preliminary design (preliminary design)???? design?? the construction plan review, review, review of air defense fire. 2, the construction stage Site drawings???? acceptance. (water resource network with ) Two, design work flow Construction drawing according to the following nine steps, according to the situation can also be cross: 1, the meeting convened by the professional, to determine each other provided information time, work plan, architectural design personnel to provide the plane elevation and section. Water professional investment should be divided into 3 stages, the first stage of well location, area, capacity, volume, equipment room area, usually within a week; second stage equipment room layout, fire hydrant, wet alarm valve, water flow indicator position, generally in early time, about 2 ~ 3 week; The third stage to estimate professional equipment and materials provided in the general table, drawing a week before. Other professional to the professional information provided must be clear about the investment time and write the work plan. The first stage should provide air conditioning air conditioning water supplement, the second phase construction should provide details in the bathroom, time is early, drawing the professional drawn equipment room drawing immediately after entering the bathroom products, investment time must adhere to as soon as possible. The first construction investment in general is relatively simple, the investment at the first stage, look at a drawing, not the clear place to ask, the design sc

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档