技术交底——地下室钢筋绑扎工艺标准(Technical disclosure - basement reinforcement banding standard).docVIP

技术交底——地下室钢筋绑扎工艺标准(Technical disclosure - basement reinforcement banding standard).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
技术交底——地下室钢筋绑扎工艺标准(Technical disclosure - basement reinforcement banding standard) Two, the reinforcement assembling and installation engineering Steel banding process standards 4-6 basement (406-1996) The range of 1 This technology is applicable to steel banding basement floor, wall of reinforced concrete. 2 construction preparation The 2.1 main materials and equipment: 2.1.1 bar: should have the certificate, according to the provisions for mechanical test. When the brittle fracture and other special circumstances occur during the machining process, the need for chemical composition analysis. There should be no old rust and dirt. 2.1.2 wire: can use 20 ~ 22 wire (fire wire) or galvanized wire (Qian Si). The wire cutting length to meet the requirement of operation. The protective layer of concrete with 2.1.3 control mortar pad, plastic card, hook or rod etc.. 2.1.4 tools: steel hook, crowbar, wrench, lashing wire rack, brushes, trolleys, chalk and rulers. 2.2 operating conditions: According to the provisions of 2.2.1 plan construction site location, reinforced yard clean, smooth. Ready to stow according to rebar order classification and cleaning, corrosion. 2.2.2 check the reinforcement level, type, shape, size and quantity are the same with the single design drawings and processing ingredients. 2.2.3 when the high underground water level construction site, must have drainage and dewatering measures. 2.2.4 familiar with the drawings, in order to determine the reinforcement with, and do the work in conjunction with the relevant types, such as formwork, pipeline, waterproof construction and assembling reinforcement relationship, construction method, make technical disclosure. 2.2.5 according to the basement waterproof construction scheme (by sticking plaster or construction), floor reinforcement binding finish bottom waterproof layer and a protective layer; a bottom end around the template (or end wall masonry protection, waterproof layer). When used in the basement wa

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档