- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建设程序(Construction procedure)
The best answer to A project management contract signed
B project management approach
C engineering design
C/01 program design
The preliminary design of C/02
For the preliminary design of C/03
C/04 construction design
C/04.01 construction design
C/04.02 construction drawing review
C/04.03 delivery of drawings
Project planning procedures for D
D/01 application design review notice
D/02 special approval (air defense, fire protection, traffic, landscape)
D/03 plans to start the official annual plan
D/04 apply for construction project planning permit
E for the project construction permit
E/01 started to receive approval form
E/02 signed the municipal facilities
E/03 do receive the application form
E/04 tender for the examination and approval formalities
E/05 general contracting operation
Preparation and approval of E/05.01 prequalification documents, bidding documents
E/05.02 tender will be prepared
E/05.03 bidding documents
E/05.04 scene
The preparation of tender documents and submit E/05.05
E/05.06 opening
E/05.07 tender reply, prepare the bid evaluation report
E/05.08 calibration, the bid winning notice
E/05.09 agreed and signed the contract
E/05.10 total contract for the record
E/06 supervision contract operation
E/06.01 bidding qualification
E/06.02 bidding documents
E/06.03 scene
The preparation of tender documents and submit E/06.04
E/06.05 issuing
E/06.06, preparation of tender units defense evaluation report
E/06.07 calibration, the bid winning notice
E/06.08 supervision contract signed
Supervision contract for E/06.09
E/07 implementation of the supervision contract
The E/07.01 project supervision outline review
The performance evaluation process of E/07.02 project implementation supervision
E/07.02.01 project schedule control
Quality control of E/07.02.02 project
Cost control of E/07.02.03 project
E/07.02.04 engineering change and cost claims and price adjustment management
E/07.02.05 construction risk prevention and management
The
您可能关注的文档
- 生活百科201102(Encyclopedia of life 201102).doc
- 生活健康(Life health).doc
- 生活垃圾处理工程(Municipal solid waste treatment project).doc
- 生活巧门(The door of life).doc
- 生活小妙招(Life coup).doc
- 生理笔记(Physiological note).doc
- 生理名词解释(Physiological noun interpretation).doc
- 生理学练习题(二)(Exercises for Physiology (two)).doc
- 盲爱(Blind love).doc
- 生理试题(Physiological questions).doc
- 森林群落发育及演替.ppt
- 2025届江苏省苏州市工业园区中考一模数学卷(含解析).pdf
- 高中历史选择题考试技术(四)考试技巧之逻辑判断 用“全面”的观点 高考历史做题方法指导.pptx
- 10,2酸和碱的中和反应课件--九年级化学人教版下册.pptx
- 2025届江苏省泰州市兴化市中考一模数学试卷(附解析).docx
- 2025届江苏省扬州市中考一模数学试卷.docx
- 2025届江苏省泰州市靖江市中考一模数学试卷(附解析).docx
- 9.3 力与运动的关系 -八年级物理下册课件(苏科版).pptx
- 2025届江苏省中考数学一模试卷(附解析).docx
- 2025年江苏省常熟市中考第一次适应性考试数学试卷(附解析).docx
文档评论(0)