建筑工程施工质量管理(Construction quality management).docVIP

建筑工程施工质量管理(Construction quality management).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑工程施工质量管理(Construction quality management) The quality management of building construction The first chapter of construction engineering quality problems The characteristics of the construction engineering quality is decided by the characteristics of production and construction of the construction of the project itself. The characteristics of construction project and its production are summed up in the following points: one is the fixed products, the liquidity of production; two is the product diversity, single production; three products is huge, high investment, long production cycle, with risk; four is the product of social and external constraints production. The construction project based on the above characteristics, the formation of the construction engineering quality itself has the following characteristics: the quality of building engineering design level, material quality, advanced construction methods and technical measures, whether many factors in place, personnel quality, schedule etc.. At present, there are common problems in the construction engineering quality are mainly in the following aspects: 1.1 engineering design quality is not high At present, many engineering design quality lack of attention, many owners in order to save design costs, not employ design professional design institute, and some shows please design, this part of the project design documents are not complete, the engineering design calculations and drawings do not coincide; seismic concept design of engineering structure and inconsiderate, structure is not reasonable, the component design does not meet the standard requirements, the beam column design does not meet the rate of 7.3%. As in the design of roof waterproof, parapet roof, found a local flashing eaves height is not enough; there are joints of roofing copestone unreasonable design; free drainage roof, eaves not tin flashing eaves, and not out of the edge overhang roll. [1] also have kitchen and bathroom design with hollo

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档