工程项目管理流程(Engineering project management process).docVIP

工程项目管理流程(Engineering project management process).doc

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程项目管理流程(Engineering project management process) Project management process A signed a project management contract B project management approach C engineering design C/01 program design The preliminary design of C/02 For the preliminary design of C/03 C/04 construction design C/04.01 construction design C/04.02 construction drawing review C/04.03 delivery of drawings Project planning procedures for D D/01 application design review notice D/02 special approval (air defense, fire protection, traffic, landscape) D/03 plans to start the official annual plan D/04 apply for construction project planning permit E for the project construction permit E/01 started to receive approval form E/02 signed the municipal facilities E/03 do receive the application form E/04 tender for the examination and approval formalities E/05 general contracting operation Preparation and approval of E/05.01 prequalification documents, bidding documents E/05.02 tender will be prepared E/05.03 bidding documents E/05.04 scene The preparation of tender documents and submit E/05.05 E/05.06 opening E/05.07 tender reply, prepare the bid evaluation report E/05.08 calibration, the bid winning notice E/05.09 agreed and signed the contract E/05.10 total contract for the record E/06 supervision contract operation E/06.01 bidding qualification E/06.02 bidding documents E/06.03 scene The preparation of tender documents and submit E/06.04 E/06.05 issuing E/06.06, preparation of tender units defense evaluation report E/06.07 calibration, the bid winning notice E/06.08 supervision contract signed Supervision contract for E/06.09 E/07 implementation of the supervision contract The E/07.01 project supervision outline review The performance evaluation process of E/07.02 project implementation supervision E/07.02.01 project schedule control Quality control of E/07.02.02 project Cost control of E/07.02.03 project E/07.02.04 engineering change and cost claims and price adjustment management E/07.02.05 construction risk

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档