- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
机修工职位说明书目录(Job description manual catalogue)
The mechanic job catalog
A, job responsibility
Two, task
Three, the mechanic production dispatch
Four stage four, mechanic work
(1) the pre preparation stage
(2) direct preparation stage
(3) the implementation stage
(4) phase shift
Five, the mechanic safety standards of civilization
Six, the basic quality of mechanic
Appendix: maintenance work instruction, maintenance work record.
Mechanic job description
A, job responsibility:
Implement the equipment maintenance work, to ensure the normal operation of mechanical equipment factory.
Two, task:
1, within the specified time, method, use the companys current effective maintenance manual in technical requirements or guidelines, with the completion of the normal equipment maintenance plan issued by the company (and repair), daily maintenance and repair equipment repair work temporary failure.
2, according to the companys equipment lubrication and other equipment maintenance regulations, complete equipment lubrication and complicated maintenance work.
3, in the premise of ensuring the quality of equipment maintenance, make use of old pieces of the repair equipment use.
4, with the renovation project, completed equipment modification, the company issued the installation and commissioning work.
5, responsible for the use of tools, measuring tools, maintenance of equipment maintenance and custody of the work.
6, complete other tasks assigned by the leadership.
Three, the mechanic production dispatch
1, grinding mechanic implementation on daily scheduling, staff scheduling should be received within 5 days after the proposed objection, otherwise the staff should work attendance strictly in accordance with the scheduling plan, personnel in case of tension or special circumstances, adjust the scheduling length must be notified in advance.
2, scheduling should pay attention to the following matters:
(1) the rational deployment of personnel collocation, such as new employees must arrange
您可能关注的文档
- 梁平法(Liangpingfa).doc
- 控制性详细规划图志成果及深度要求(Control detailed planning results and in depth).doc
- 楼盘风格详解(Real estate style detailed).doc
- 楼梯规范(Stair code).doc
- 快速学会写宋词(Quickly learn to write Song Ci).doc
- 楼梯宽度、高度(Stair width and height).doc
- 楼梯设计标准(Stair design standard).doc
- 拉斐尔(Rafael).doc
- 楼梯手算方法(Stair hand counting method).doc
- 拉萨(Lhasa).doc
- 机修工段长年终总结(End of year summary).doc
- 含铝多的食物(Food containing much aluminum).doc
- 哈哈哈(Ha ha ha).doc
- 机制币铸造流程中的修模、滚边、挑拣及成品率(The mechanism of currency in the process of casting mold repair, piping, pick and rate of finished products).doc
- 喝茶的好处(The benefits of drinking tea).doc
- 喝蜂蜜水的好处(The benefits of honey water).doc
- 家畜环境卫生学·福建农林大学考试试卷(Veterinary Environmental Hygiene & examination papers for Fujian Agriculture And Forestry University).doc
- 家电维修论文(Appliance maintenance thesis).doc
- 合成氨(synthetic ammonia).doc
- 家纺英文收集(Home Textile English collection).doc
最近下载
- 2025年河北省政府采购评审专家考试题库(含答案).docx VIP
- 电动重卡充电站建设方案.docx VIP
- 一种白肉灵芝-魔芋胶压片糖果及其制备方法.pdf VIP
- 20J333 建筑防腐蚀构造.docx VIP
- 24J113-1 内隔墙-轻质条板(一).docx
- 保护区安全准入复习试题附答案.doc
- 工厂分伙协议合同.docx VIP
- 古韵悠长 第一课《雕梁画栋》课件 2024——2025学年人美版(2024)初中美术七年级上册.pptx VIP
- TCECS1517-2023 装配式压制玻璃钢排水检查井应用技术规程.pdf VIP
- 《企业安全生产培训需求分析与课程设计》PPT课件.pptx VIP
文档评论(0)