- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Checking ground electrode impedance for (检查地线阻抗的)
Checking ground
electrode impedance for
commercial, industrial
and residential buildings
Application Note
Most facilities have grounded electrical systems, so that in the event of a lightning strike
or utility overvoltage, current will find a safe path to earth. A ground electrode provides
the contact between the electrical system and the earth. To ensure a reliable connec-
tion to earth, electrical codes, engineering standards, and local standards often specify
a minimum impedance for the ground electrode. The International Electrical Testing
Association specifies ground electrode testing every three years for a system in good
condition with average up-time requirements. This application note explains earth/ground
principles and safety in more depth and then describes the principle testing methods: 3
and 4 pole Fall-of-Potential testing, selective testing, stakeless testing and 2 pole testing.
Why Ground? systems connect the earth near the building with
the electrical system and building steel. In a light-
The US National Electrical Code (NEC) gives two ning strike, the facility will be at approximately the
principle reasons for grounding a facility. same potential. By keeping the potential gradient
• Stabilize the voltage to earth during normal low, damage is minimized.
operation. If a medium voltage utility line (over 1000 V)
• Limit the voltage rise created by lightning, comes in contact with a low voltage line, a
line surges or unintentional contact with drastic overvoltage could occur for nea
您可能关注的文档
- Chapter 14 Human Factors faa.gov(人类因素faa.gov第14章).pdf
- Chapter 19 BODIPY Laser dyes applied in (第十九章BODIPY染料激光应用于).pdf
- Chapter 2 Notes, Algebra I Suffolk City Public (第二章指出,代数我萨福克郡城市公共).doc
- Chapter 2 KINETIC THEORY PhysicsANU(第二章PhysicsANU分子运动论).pdf
- CHAPTER 19 ELECTROCHEMISTRY(章19 电化学).doc
- CHAPTER 2 DYNAMIC FORCE ANALYSIS Indian (第二章动力分析印度).pdf
- Chapter 2 Lagrange’s and Hamilton’s Equations(第二章拉格朗日和汉密尔顿的方程).pdf
- Chapter 2 Poisson’s Equation University of (第二章泊松方程大学).pdf
- CHAPTER 2 PRONY ANALYSIS School of (第二章普龙尼分析学院的).pdf
- Chapter 2 Accelerometer Theory Design (第二章加速度计理论与设计).pdf
- CHED MEMORANDUM ORDER (CMO)(下风备忘录顺序(CMO)).pdf
- Checklist for Market Risk Management(为市场风险管理清单).pdf
- CHEMEON Surface Technology CHEMEON(CHEMEON CHEMEON表面技术).pdf
- Chemical Engineering Design Elsevier(化学工程设计爱思唯尔).pdf
- Chemical Formula Writing Worksheet(化学公式编写工作表).pdf
- Chemical dilution chart. Coastwide Labs(化学稀释图表。).pdf
- CHEMICAL COMPATIBILITY CHART Bal Seal (化学兼容性图表Bal密封).pdf
- CHEMICAL FORMULAS AND FORMULA WEIGHT (化学公式和公式的体重).pdf
- CHEMICAL OXYGEN DEMAND Fisher Scientific(化学需氧量,费舍尔科学).pdf
- Characterization of Metal Powders Used for (表征金属粉末用于).pdf
文档评论(0)