- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Commercial, Aerospace Structural and Certified (商业、航空航天结构和认证)
Commercial, Aerospace Structural
and Certified Welding and Brazing
Capabilities
Whatever your requirements, HTG Brite Braze is a Welding Specialist that has the capabilities to
serve as your company’s needs in the area of aerospace Brazing. Heat-treating and Welding,
Several of our customers have become concerned that our pricing will become higher for jobs
requiring Nadcap. That will not be the case for jobs that were previously quoted to Aerospace
specifications. However, if we did not know the end use of the part or ultimate customer and we
quoted to commercial rates; rest assured the price will be raised. All Aerospace welded WILL
REQUIRE Documented Procedures: A documented procedure requires a procedure to be
established, documented, implemented, and maintained. In addition to the documentation,
all incoming components now require incoming inspection for dimensions and tolerances
prior to start of the welding operation. Also, advanced operator training is required for
each part number in the area of dimensional inspection of component parts and
inspection tooling. Engineering sign off of all documents per part number is required.
These additional steps, as well as, additional time required for contract review of every job
will also add to the cost.
In order to properly communicate the scope of our work and the additional engineering
time required to proceduralize all methods and techniques, we have included the following
information:
Best Practice: Certification to Program Standards
The Nadcap certification for, welding, heat treating and brazing requires both documented
procedures and process control. HTG found that many of the requirements of the certification
were already in place as a result of its efforts in obtaining ISO 9001:2000 and: 2008 and AS
9100:2001 certifications and has resulted in an increased demand for engineering intervention
during job development as well as Contract Revie
您可能关注的文档
- Chevrolet Orlando Technical Specification Data(雪佛兰奥兰多技术规范数据).pdf
- chi Brown University(气布朗大学).pdf
- Chess Master Free Chess Area(国际象棋大师免费国际象棋).pdf
- Chiksan Original Swivel Joints SeekPart(Chiksan原始旋转关节SeekPart).pdf
- Chilled Water Fan Coil Unit Trane(冷冻水风机盘管特灵).pdf
- China International Trade Administration(中国国际贸易管理).pdf
- Cherry rivetless Nut Plate ProCess MaNual(樱桃rivetless螺母板加工手册).pdf
- Chinese (Mandarin), Phonology of(中文(普通话),音系学).pdf
- Chinese symbols British Museum(中国的象征大英博物馆).pdf
- Chip classifier OpTest(芯片分类器选择).pdf
文档评论(0)