- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Comparison to conventional hydro
A low-head hydro project generally describes an installation with a fall of water less than 5 metres (16 ft). Most current hydroelectric projects require a large hydraulic head to power turbines to generate electricity. The hydraulic head either occurs naturally, such as a waterfall, or is created by constructing a dam in a river bed, creating a reservoir. Using a controlled release of water from the reservoir creates the head required to turn the turbines. The costs and environmental impacts of constructing a dam make traditional hydroelectric projects difficult to construct.
Damless hydro capture the kinetic energy of rivers, channels, spillways, irrigation systems, tides and oceans without the use of dams
Construction of a dam and reservoir has many environmental effects. For example, the damming of a river locks the movement both of fish upstream to spawn and of silt downstream to fertilize fields . In addition, he vegetation overwhelmed by the rising water decays to form methane a far worse greenhouse gas than carbon dioxide
Since no dam is required, low-head hydro may dramatically reduce the following:
The safety risks (of having a dam), avoiding the risk of a flash flood caused by a breached dam
Environmental and ecological complications
Need for fish ladders
Silt accumulation in basin
Regulatory issues
The initial cost of dam engineering and construction
Maintenance
Removing silt accumulation.
However, low-head units are necessarily much smaller in capacity that conventional large hydro tubines; many more must be built for a given annual energy production – some of the costs of small turbine/generator units is offset by lower civil construction cost. Just as for large hydro, not every site can be economically and ecologically developed; sites may be too far from customers to be worth installation of a transmission line, or may lie in areas particularly senstive for wildlife.
Hydrokinetic turbines
A “Hydrokinetic” turbine is
您可能关注的文档
最近下载
- 2025年江苏工会工作者招聘考试(工会基础知识)历年参考题库含答案详解.docx VIP
- 最新工会考试知识题库含答案.docx VIP
- 2025工会招聘社会化工会工作者综合知识专业能力测试题库.docx VIP
- 在线网课学习课堂《学术交流英语(哈工 )》单元测试考核答案.docx VIP
- 2025年陕西工会工作者招聘考试(工会基础知识)历年参考题库含答案详解.docx VIP
- 冬季管道排水工程施工方案(DOC).docx VIP
- 2025年社会化工会工作者综合素质与工会知识题库.docx VIP
- 清洁能源-氢能-课件.ppt VIP
- 2025年工会工作者法律法规与基础知识题库.docx VIP
- 爱默生质量流量计简明使用手册(一).pdf VIP
原创力文档


文档评论(0)