- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
水温碎石(Water temperature macadam)
水温碎石(Water temperature macadam)
Discussion on design and construction of water stabilized granular aggregate -|BB published in 2005-6-14 9:52:00
Zhuyue
The cement stabilized aggregate as road base, has high early strength, the impact of the rainy season of construction is relatively small, the degree of mechanization of construction features, which are conducive to ensure the progress and quality, so it is more and more widely used in Highway Engineering in recent years, our company has conducted several construction projects of water stable aggregates, such as Tang Jin expressway, riverbanks engineering, 106 National Highway, the highway reconstruction project and the present in the construction of 307 National Highway, the composition design and construction experiences.
I. characteristics of water stabilized aggregate
1, advantages:
(1) early strength, short time (5~7 days) can be more than 2.0Mpa intensity.
(2) the stability is good, the structural layer itself has certain permeability, and is less affected by water.
(3) according to the design requirement, the required strength is adjusted by changing the composition design, while the strength of other structural layers is restricted by the material itself.
(4) mechanized construction, good quality, rapid progress, small section of sporadic projects, you can use simple machinery or manual mixing, paving, flexible and economic.
2, shortcomings:
(1) strength after the formation of easy to produce shrinkage crack, the crack is one of the major diseases of water stable aggregates, can cause cracking of the upper layer, resulting in the rainy season when water caused the early damage of roadbed, road embankment, shorten the service life.
(2) segregation is easy during construction.
(3) after the strength is formed, the surface of the wheel is easily peeled off and worn under the action of external force such as wheel.
(4) short delay time, from mixing to rolling molding, should be completed in a relatively short per
您可能关注的文档
- 施工放线(工地实用)(Construction release (site utility)).doc
- 施工的工艺流程(Construction process).doc
- 旅游知识问答(Travel quiz).doc
- 施工放线之内控法怎样操作施工放线之内控法怎样操作(How to operate the internal control method of construction line and how to operate the internal control method).doc
- 旅游网络公共关系营销探索(Exploration of public relations marketing in Tourism Network).doc
- 旅游规划应着力的八个要点(Eight points to be stressed in tourism planning).doc
- 施工残忆(Construction remnant).doc
- 无心磨床加工的磨削缺分析(Analysis of grinding loss in centerless grinding machine).doc
- 无损检测标准一览表(List of standards for nondestructive testing).doc
- 无比打字口诀(Very typing formulas).doc
- 2015-2016学年山东省菏泽市定陶县九年级(下)期中化学试卷 .pdf
- 2019-2020年七年级语文上册第三单元10再塑生命的人课后作业习题新人教.pdf
- 2018年怎么写研发费用中材料自查报告-实用word文档 (6页) .pdf
- 2021高校实验室安全考试-高校实验室安全考试试题七(精选试题).pdf
- 2019-2020年高中美术 第8课新的探索──现代绘画、雕塑和工业设计教案.pdf
- 2019年三年级数学上册五解决问题的策略教案苏教版 .pdf
- 2016年度出版专业职业资格考试中级基础知识(第七章) .pdf
- 2019-对数函数评课稿-范文 (10页) .pdf
- 2019-2020年高一上学期期末试卷(数学) .pdf
- 2019年中级经济师《工商管理》试题及答案(卷三) .pdf
文档评论(0)