水温碎石(Water temperature macadam).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
水温碎石(Water temperature macadam)

水温碎石(Water temperature macadam) Discussion on design and construction of water stabilized granular aggregate -|BB published in 2005-6-14 9:52:00 Zhuyue The cement stabilized aggregate as road base, has high early strength, the impact of the rainy season of construction is relatively small, the degree of mechanization of construction features, which are conducive to ensure the progress and quality, so it is more and more widely used in Highway Engineering in recent years, our company has conducted several construction projects of water stable aggregates, such as Tang Jin expressway, riverbanks engineering, 106 National Highway, the highway reconstruction project and the present in the construction of 307 National Highway, the composition design and construction experiences. I. characteristics of water stabilized aggregate 1, advantages: (1) early strength, short time (5~7 days) can be more than 2.0Mpa intensity. (2) the stability is good, the structural layer itself has certain permeability, and is less affected by water. (3) according to the design requirement, the required strength is adjusted by changing the composition design, while the strength of other structural layers is restricted by the material itself. (4) mechanized construction, good quality, rapid progress, small section of sporadic projects, you can use simple machinery or manual mixing, paving, flexible and economic. 2, shortcomings: (1) strength after the formation of easy to produce shrinkage crack, the crack is one of the major diseases of water stable aggregates, can cause cracking of the upper layer, resulting in the rainy season when water caused the early damage of roadbed, road embankment, shorten the service life. (2) segregation is easy during construction. (3) after the strength is formed, the surface of the wheel is easily peeled off and worn under the action of external force such as wheel. (4) short delay time, from mixing to rolling molding, should be completed in a relatively short per

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档