铁路站场清筛改造方法及整治对策(Cleaning method and renovation measures of railway station).docVIP

铁路站场清筛改造方法及整治对策(Cleaning method and renovation measures of railway station).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
铁路站场清筛改造方法及整治对策(Cleaning method and renovation measures of railway station)

铁路站场清筛改造方法及整治对策(Cleaning method and renovation measures of railway station) Cleaning method and renovation measures of railway station Abstract: through the railway station construction project field renovation construction, on the line between the shoulder high, poor drainage area to take the first line between the shoulder, after cleaning and replacement of high quality ballast for the comprehensive management, public works, and take the bus services and electricity, combining the design with field in principle the station span construction, this construction method reduces the construction of interference and influence of transportation, the equipment condition improved. Keywords: cleaning station renovation renovation construction method Abstract: the construction of the railway station in the formulation of reform implementation plan, on the line between the curbs are too high, poor drainage of the lot to take the first down line between the shoulders, and back after the clear screen method of providing high-quality comprehensive ballast management and to, take works, bus services and electricity services co-design with the principle of live reality show in the station long construction, this construction method reduces the interference and the construction of transport, making the device state to improve. Key word: the station yard sieves the transformation clear job practice improvement 1 of the problem Song to railway is the Zhengzhou coal coal Sinotrans thoroughfare from 1995 opening and operation has serious pollution caused by compaction of track bed for many reasons, the original 50% basic not comprehensive maintenance, only some basic maintenance work, especially in the 2007 2009 report song for shop of 50kg rail, ballast cleaning is not complete overhaul project. With the continuous development of railway construction, the train number 105 on the daily through, coupled with increasing train density, objectively and effectively reduced the time and volu

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档