hahha(哈哈).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
hahha(哈哈)

hahha(哈哈) The 50 line is the line 50 cm high. It is an auxiliary line used to control the elevation of the structure. 50 lines, 50 lines of construction and 50 lines of structure. The 50 line is used to control the building walls and windows, door position and elevation, ground, ceiling plastering, skirting the elevation. Building 50 lines are generally used to control the structure of concrete pouring elevation. The 50 line is the line 50 cm high. It is an auxiliary line used to control the elevation of the structure. 50 lines, 50 lines of construction and 50 lines of structure. The 50 line is used to control the building walls and windows, door position and elevation, ground, ceiling plastering, skirting the elevation. Building 50 lines are generally used to control the structure of concrete pouring elevation. I am an intern, and the master went to super flat, a total of 12 layers of shear wall frame structure, on the 11 floor to copy 50 lines. Although I practice, many have been in contact with, only the level I can not, mainly fear, fear of mistakes, and simply give up, I do not blame myself, because after the internship does not want to work in the site. Three a good tripod, I put a level up, probably adjusted it with my master said, Im not a good tune, you can. Because the master is more than 50 years old, he seems, who knows he did not look round bubble began to look at the tower ruler, measuring two points, Im looking blisters, blisters that deviated from the center, I said to the master, the master is ah, say a few times, he did not answer me quickly ran downstairs, took up his reading glasses, I am tired of breath up, he also did not measure a few points, I gave him the glasses, he also did not wear, then help the tower ruler out of some problems, he went to see. The Contractor a carpenter also came to help him see the ultra flat, level of my master said, this is some partial blisters ah, after he was one knob leveling in level position, and then rotate an

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档