mss滑移模架施工工艺及技术控制(MSS sliding formwork construction technology and control technology).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
mss滑移模架施工工艺及技术控制(MSS sliding formwork construction technology and control technology)
mss滑移模架施工工艺及技术控制(MSS sliding formwork construction technology and control technology)
Proceedings of the fourteenth annual meeting of the society of bridge and structural engineering, Chinese society of Civil Engineering
Chinese Institute of civil engineering of bridge and structural engineering institute proceedings of the fourteenth annual conference of the Nanjing Yangtze River Bridge project.
Construction technology and technical control of MSS sliding die set
Nanjing Yangtze River Bridge 50m bridge construction
Liu Jizheng, Qi Lujie, Wang Xiaoshan
(Shandong Province Traffic Engineering Corporation, Nanjing Yangtze River Bridge Project Department)
[Abstract] this paper briefly introduces the structure and composition of MSS slip and its application in construction.
Sliding formwork; construction technology; deflection control
I. General Situation of the project
Nanjing Yangtze River Bridge North Bridge bridge upper structure for 16m*30m and 5m*50m PC with variable cross section continuous beam bridge. The whole bridge section is composed of two single box and single chamber beam sections separated from top to bottom, and a central partition cover plate is arranged in the middle. among
5 * 50m approach bridge in
30m approach bridge and the main bridge transition section, the bridge is located in land and water, land a hole, four holes on the water, the peak water level 7m. Therefore, it is very important to choose an optimum construction scheme.
Two, scheme comparison
Based on the bridge position of 50m bridge, two schemes should be adopted for the construction of superstructure: 1. Support construction, set up a full support with one hole on the river bank, insert four hole copper pipe pile in water, and build a steel pipe pile support. Adopt the construction without scaffold. That is, the introduction of foreign advanced equipment - sliding die frame for construction.
The first construction plan is the traditional construction method of our company. There are a
您可能关注的文档
- b2b电子商务(B2B Electronic Commerce).doc
- belliss 高压空压机操作保养制度(Belliss high pressure air compressor operation maintenance system).doc
- b5(B5).doc
- bearing(轴承).doc
- blizzard 暴雪公司十年史(blizzard 暴雪公司十年史).doc
- bmp2pcb的使用方法(The use of bmp2pcb).doc
- autodesk autocad 2000快捷键(Autodesk AutoCAD 2000快捷键).doc
- bose fs3ii-chs(Fs3ii Bose community health service).doc
- bom的重要性(The importance of BOM).doc
- c 趣味算法(C fun algorithm).doc
- mtk history机制深入分析(A thorough analysis of MTK history mechanism).doc
- mxd小宝全部歌词(MXD Andy all the lyrics).doc
- mysql事务学习(MySQL learning affairs).doc
- mysql优化技术(MySQL optimization technology).doc
- mysql数据库附加(Additional MySQL database).doc
- mysql索引详解(The MySQL index.).doc
- mysql索引资料(MySQL index data).doc
- mysql索引实例(MySQL index case).doc
- m型社会移动运营商营销战略蝶变(M social mobile operators marketing strategy transformation).doc
- mysql的基本命令(The basic MySQL commands).doc
文档评论(0)