vc常见的108个问题(108 common problems VC).docVIP

vc常见的108个问题(108 common problems VC).doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
vc常见的108个问题(108 common problems VC)

vc常见的108个问题(108 common problems VC) Disaster relief and continuous wall Professor Shen Maosong, Department of civil engineering, national Kaohsiung University of Applied Sciences The standard penetration test and the number of NSPT is less than or equal to 4 moisture content than liquid limit LL soft clay silt with NSPT less than 10 of the loose sand sites, and more than two kinds of soil layer into the site, or collapse hole in the continuous wall construction, and with the continuous wall of concrete mixing, resulting in a continuous wall, mud bag bag, mixed mud and sand clods of the chain of Engineering disaster. The site of continuous wall mud bag can be classified as A, B, C and D four kinds of mud pack sites. Excavation disaster time by example analysis, soft clay, silt uplift failure time is about 12 to 13 hours, the flow of sand sand occurred failure time is about 1 hours. The continuous wall site in addition to underground excavation occurred when mud packs damaged, damaged adjacent engineering disaster, continuous wall is designed for permanent basement exterior wall structure of the site, after the project is completed and in use for many years after the building, will damage and damage disputes. Based on the engineering example analysis of continuous wall damage after the disaster site and emergency relief method, so as to accumulate knowledge basement engineering of disaster rescue, as a reference for excavation strain disposal. Shen Maosong [1] pointed out that as an underground continuous wall excavation of temporary retaining wall, even as a permanent wall structure design used in the basement, the soil is loose, will produce a package of mud, dirt, mud and mixed bag sand and other chain engineering disaster, and continuous wall in different periods of mud pack seepage damage the disaster caused by the project, such as roads, the adjacent building base near the settlement and dumping, breaking the tap water pipe pipe, gas pipe, electric power, teleco

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档