- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
不良地基处理方法(Methods the poor foundation treatment)
不良地基处理方法(Methods the poor foundation treatment)
Method and construction technology of bad foundation soil, treatment and reinforcement
--------------------------------------------------------------------------------
Source: China Bidding net release date: 2006-09-09 browsing times: 15568
Substitution method
(1) replacement method
It is to dig out the bad foundation soil of the surface layer, and then backfill the soil with better compaction characteristics to compaction or tamping, and form a good bearing stratum. Thereby, the bearing capacity characteristics of the foundation can be changed, and the deformation resistance and stability can be improved.
Construction points: the soil layer to be converted, pay attention to the stability of the pit; to ensure the quality of the filling; filling should be layered and compacted.
(2) vibro replacement method
By using special vibratory machines and tools, under the high pressure water jet, the edge of the edge is washed and made into holes in the ground, and then piles of gravel or gravel are formed in batches to form a pile body. The composite foundation is made up of the pile body and the base soil in order to improve the bearing capacity of the foundation and reduce the compressibility.
Note: the construction of gravel pile bearing capacity and settlement largely depends on the in-situ soil lateral constraints on it, the constraint effect is weaker, the effect of gravel pile is worse, so the method for soft clay strength is very low when must be careful.
(3) tamping (extrusion) replacement method
The pipe (hammer) is put into the soil by means of an immersed tube or a rammer, so that the soil is pushed to the side, and the gravel or sand is filled in the pipe (or tamping hole). The pile and soil in composite foundation, the soil compaction due to extrusion, lateral extrusion, surface uplift, soil pore water pressure increases, when the dissipation of excess pore water pressure after the soil strength is also a correspo
您可能关注的文档
- ug post(UG后).doc
- ujth(ujth).doc
- uniqlo促销策略(UNIQLO promotion strategy).doc
- treeview(控件).doc
- uo技能练法(Uo skills training).doc
- ut斯达康一家好公司为何会失败(UT why a good company will fail).doc
- uv lay out 使用说明(Use UV to shake out the).doc
- stm32中几个gpio寄存器总结(Summary of several GPIO register stm32).doc
- vagrants流浪者人物攻略(vagrants流浪者人物攻略).doc
- vb操作xml文件(VB XML file operation).doc
- 不锈钢加工(Stainless steel processing).doc
- 不锈钢知识(Knowledge of stainless steel).doc
- 与众不同的苹果,创新的商业模式.doc
- 与地理有关歌曲、谚语等(The songs, proverbs and geography).doc
- 与梦想相伴(And accompanied by dreams).doc
- 与环境保护有关的词汇(And environmental protection related words).doc
- 专业做土方工程的软件htcad(Do professional earthwork software htcad).doc
- 专业复习(Professional review).doc
- 专业英语一(Professional English).doc
- 专业销售不锈钢金属材料,无锡五宝金属公司简介(Professional sales of stainless steel metal materials, Wuxi Wubao metal company).doc
最近下载
- 餐饮连锁新店选址评估表.xlsx VIP
- 第节特种陶瓷粉体制备方法特种陶瓷粉体制备方法.PDF VIP
- 幼儿园大班数学《10以内的加减法》PPT课件.pptx VIP
- 【课件】免疫与免疫规划+第二课时+免疫的功能与免疫规划课件人教版生物八年级上册.pptx VIP
- GBT50417-2017 煤矿井下供配电设计规范.docx VIP
- 2024-2025学年酒泉市金塔县重点中学小升初数学入学考试卷含解析.doc VIP
- 飞机维护模拟训练系统.doc VIP
- DBJ51/168-2021四川省住宅设计标准.docx VIP
- [泰州]江苏泰州泰兴现代农业产业园区招聘员额制工作人员10人笔试历年典型考点(频考版试卷)附带答案详.docx VIP
- DB61_T 5079-2023 城市轨道交通工程沿线土遗址振动控制与监测标准.docx
文档评论(0)