- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
临时码头施工方案(The construction scheme of temporary pier)
临时码头施工方案(The construction scheme of temporary pier)
Temporary dock construction program.Txt my father said the most moved me a word: children, study hard, dad used to play mahjong are playing 10, and now in order to study for you, change to play 1 of the.. Temporary pier construction scheme
1. pier overview
The first section is * * * * * * * temporary pier water riprap wharf, considering the construction progress, reduce land fill pressure pushing combined with the actual situation of saving construction ancillary facilities investment, using 10 * 6 * 3 steel cage structure, the main frame is composed of 80 * 6000 * 3 galvanized pipe and 12 dry steel, reinforced by the middle of 20 encrypt the channel and channel and channel steel and galvanized pipe joints are to strengthen the welding. The temporary dock structure is a combination of gravity and sheet pile type. The first is to use the weight of the stone in the reinforcing cage to achieve its stability, and two is to increase the anchoring system to improve its anti overturning capacity.
According to the geological conditions of * * * temporary pier 23 divers Tanmo quay site reflect the location of 80cm mud, as had been pushed to fill core 7 - 8 meters high, according to slope 1:1, calculated in the silt surface is at least 7 to 8 meters of the breakwater stone scattered in, form a great impact on the installation of reinforcement cage. Construction site without water and electricity facilities, all materials are processed in the project department after welding in the field, coupled with traffic inconvenience, the construction schedule has a certain impact.
2. hoisting of steel cage and installation of tie rod
Since the installation of steel cage is far away from the present dike head, it is about 12M, and the general crane can not meet the requirement. Therefore, the use of 50 ton truck crane and the mechanical parameters of the crane. Setup: 50 hanging in the field by using the four point suspension (frontier
您可能关注的文档
- 一种无线传感器网络环境自适应的定位算法(Localization algorithm for wireless sensor network environment adaptive).doc
- 一种正弦波逆变电源的方案(A sine wave inverter power supply scheme).doc
- 一种无乘法器的小功率pfc芯片电路设计_51_55.doc
- 一级减速器设计说明书(A reducer design specification).doc
- 一种自动折叠抛物面天线结构设计span(An automatic folding paraboloid antenna structure design span).doc
- 一站到底 题目20121025(A station in the end Title 20121025).doc
- 一级减速器设计(Design a reducer).doc
- 一级减速器说明书过程(A reducer manual process).doc
- 一级外来语(A foreign language).doc
- 一级圆柱减速器设计简图(A cylindrical gear reducer design diagram).doc
- 临终切要(Cut to death).doc
- 临邑(Linyi).doc
- 临床补液(Clinical rehydration).doc
- 丹江口市二中高二语文月考试题(2006、9))1018(Danjiangkou City, the second high school Chinese monthly test (2006, 9) 1018)).doc
- 为什么学习平面构成(Why learn graphic form).doc
- 为什么中国人现在需要创业_我的最爱(Why Chinese now need to start I love _).doc
- 主体梁、板、柱砼浇捣施工方案(The main beam plate column concrete pouring construction scheme).doc
- 主力掀主升浪的九大特征(The main characteristics of nine main wave of lift).doc
- 主压实度(Master degree of compaction).doc
- 主持人稿件草稿(The draft manuscript).doc
文档评论(0)