临时码头施工方案(The construction scheme of temporary pier).docVIP

临时码头施工方案(The construction scheme of temporary pier).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
临时码头施工方案(The construction scheme of temporary pier)

临时码头施工方案(The construction scheme of temporary pier) Temporary dock construction program.Txt my father said the most moved me a word: children, study hard, dad used to play mahjong are playing 10, and now in order to study for you, change to play 1 of the.. Temporary pier construction scheme 1. pier overview The first section is * * * * * * * temporary pier water riprap wharf, considering the construction progress, reduce land fill pressure pushing combined with the actual situation of saving construction ancillary facilities investment, using 10 * 6 * 3 steel cage structure, the main frame is composed of 80 * 6000 * 3 galvanized pipe and 12 dry steel, reinforced by the middle of 20 encrypt the channel and channel and channel steel and galvanized pipe joints are to strengthen the welding. The temporary dock structure is a combination of gravity and sheet pile type. The first is to use the weight of the stone in the reinforcing cage to achieve its stability, and two is to increase the anchoring system to improve its anti overturning capacity. According to the geological conditions of * * * temporary pier 23 divers Tanmo quay site reflect the location of 80cm mud, as had been pushed to fill core 7 - 8 meters high, according to slope 1:1, calculated in the silt surface is at least 7 to 8 meters of the breakwater stone scattered in, form a great impact on the installation of reinforcement cage. Construction site without water and electricity facilities, all materials are processed in the project department after welding in the field, coupled with traffic inconvenience, the construction schedule has a certain impact. 2. hoisting of steel cage and installation of tie rod Since the installation of steel cage is far away from the present dike head, it is about 12M, and the general crane can not meet the requirement. Therefore, the use of 50 ton truck crane and the mechanical parameters of the crane. Setup: 50 hanging in the field by using the four point suspension (frontier

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档