高层建筑抗震设计中短柱问题的处理[转自 偶路的博客]_ybbxk的建筑结构学习园地(Treatment of short column problems in seismic design of high-rise buildings [blog of self turning Road,]_ybbxk building structure, learning garden).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高层建筑抗震设计中短柱问题的处理[转自 偶路的博客]_ybbxk的建筑结构学习园地(Treatment of short column problems in seismic design of high-rise buildings [blog of self turning Road,]_ybbxk building structure, learning garden)
高层建筑抗震设计中短柱问题的处理[转自 偶路的博客]_ybbxk的建筑结构学习园地(Treatment of short column problems in seismic design of high-rise buildings [blog of self turning Road,]_ybbxk building structure, learning garden)
Building structure / short column problems in seismic design of high-rise building since the turn of the road I blog]_ybbxk learning architecture Baidu garden space | Baidu home | sign ybbxk learning structure learning
The home page blog album | personal files | friends see article
Treatment of short columns in seismic design of high-rise buildings [blog]2008-10-17 09:30[sharing] handling of short columns in seismic design of high-rise buildings
Abstract: seismic design of buildings has a definite ductility requirement for structural members. The axial compression ratio and shear span ratio are the two most important factors affecting the ductility of members, and they are also contradictory factors.
Key words: high-rise seismic short column
0 Introduction
When the storey height is constant, the column cross section increases with the decrease of axial compression ratio in order to increase ductility, and the smaller the axial compression ratio is, the larger the cross section is, while the increase of cross section leads to the decrease of shear span ratio and the ductility of the component. Therefore, in the design of high-rise buildings, especially super high-rise buildings, in order to meet the requirements of the rules [1] on the axial load ratio limit, the sections of columns are often large, and short columns or even short columns are often formed at the bottom of the structure. In addition, such as library stacks, low storey storage rooms, underground garage of high-rise buildings and so on, due to the large load and lower storey height, short columns are inevitable in the design. As everyone knows, the ductility of short column is very poor, especially ultra short columns with almost no ductility, the seismic influence in the region building suffered fortification intens
您可能关注的文档
- 链表教程(Linked list tutorial).doc
- 锁存器、触发器、缓冲器的区别(The difference between latches, triggers, buffers).doc
- 销售政策的制定与运用(Formulation and application of sales policy).doc
- 锆 石(Zircon).doc
- 销售成功三要素(Three elements of sales success).doc
- 广州市花都区兴华涌排涝站工程勘察设计(Xinghua in Huadu District of Guangzhou City Yong drainage station project survey and design).doc
- 锈与骨(Rust and bone).doc
- 锚杆技术在昭麻公路边坡治理中的应用(Application of anchor technology in slope control of Zhao Ma highway).doc
- 锂聚合物电池使用注意事项(Notes on the use of lithium polymer batteries).doc
- 锅炉运行技能鉴定试题(Boiler operation skill test).doc
- 高层建筑抗震设计中短柱问题的处理[转自 偶路的博客]_ybbxk的建筑结构(Treatment of short column problems in seismic design of high-rise buildings [building structure of blog]_ybbxk of self turning Road).doc
- 高层建筑抗震设计中短柱问题的处理(Treatment of short column problem in seismic design of high rise building).doc
- 高层建筑方案设计中结构体系的确定(Determination of structural system in scheme design of high rise building).doc
- 高层建筑施工中沉降观测技术的应用(Application of settlement observation technology in high rise building construction).doc
- 高层建筑施工后浇带的设置与施工(Setting up and construction of post pouring belt for high rise building construction).doc
- 广州话输入法索引(Guangzhou dialect input index).doc
- 高层建筑测量监理质量控制(High-rise building, Surveying Supervision, quality control).doc
- 高层建筑框架梁柱节点的强度验算和施工处理(Strength checking and construction treatment of beam column joints of high-rise buildings).doc
- 高层商住楼梁式结构转换层施工技术与质量控制探讨(Discussion on construction technology and quality control of beam type transfer floor of high-rise commercial and residential buildings).doc
- 高层建筑深基坑支护的监理要点(Key points for supervision of deep foundation pit support of high rise building).doc
文档评论(0)