高层建筑结构嵌固端的选取及相关技术问题(Selection of embedded end of high-rise building structure and related technical problems).docVIP
- 3
- 0
- 约 9页
- 2017-08-17 发布于河南
- 举报
高层建筑结构嵌固端的选取及相关技术问题(Selection of embedded end of high-rise building structure and related technical problems)
高层建筑结构嵌固端的选取及相关技术问题(Selection of embedded end of high-rise building structure and related technical problems)
High-rise building block.Txt selection and technical problems related to the fixed end of the night, because the courage to end the day; stay in bed because of the courage to start the day. A friend is someone who can see through you and like you. Selection of embedded end of high-rise building structure and related technical problems
1, introduction
The high-rise building must first determine the structure of fixed end position before the structure analysis and calculation, and the selection of built-in end faces different situations, such as no basement foundation but deeply buried; without a basement, but the number of more or less, and different foundation forms etc.. According to the above correct selection of the structure of fixed end is calculated, the high-rise building structure model is an important assumption, it is not only related to the accuracy of distribution of some component internal force in the structure, but also affect the structure of the authenticity of the lateral displacement, and the economy of the local structure, so it is necessary to further explore the block structure the fixed end of the selected, and byextension, some related technical problems.
2. The condition of the fixed end of the structure
The embedded end of a tall building is usually chosen to be marked on the ground, but the elevation at the ground level is a condition for the embedded end of the structure, and a lot of attention is also made when calculating the height at the first floor.
2.1 the condition of having a basement
(1) the basement roof elevation and outdoor floor height can not be too large, extreme conditions such as semi basement is the first floor can be structural fixed ends, unless its height is only 1 - 3 steps height to be considered;
(2) the roof structure of the basement should be a beam slab system (that is, no Liang Lougai can not be designe
您可能关注的文档
- 链表教程(Linked list tutorial).doc
- 锁存器、触发器、缓冲器的区别(The difference between latches, triggers, buffers).doc
- 销售政策的制定与运用(Formulation and application of sales policy).doc
- 锆 石(Zircon).doc
- 销售成功三要素(Three elements of sales success).doc
- 广州市花都区兴华涌排涝站工程勘察设计(Xinghua in Huadu District of Guangzhou City Yong drainage station project survey and design).doc
- 锈与骨(Rust and bone).doc
- 锚杆技术在昭麻公路边坡治理中的应用(Application of anchor technology in slope control of Zhao Ma highway).doc
- 锂聚合物电池使用注意事项(Notes on the use of lithium polymer batteries).doc
- 锅炉运行技能鉴定试题(Boiler operation skill test).doc
- 高层建筑设计中的外部尺度关系(The external scale relation in high rise building design).doc
- 高层建筑防火门选用规范的分析(Specification analysis of selection of fire door for high-rise building).doc
- 高层建筑结构转换层施工技术的运用(Application of construction technology of structural transfer floor in high rise building).doc
- 高层抗震设计(High-rise seismic design).doc
- 高层结构设计需要控制的七个比值及调整方法(转自user的博客)_ybbxk的建筑结构学习园地(The tall structure design requires seven ratios to be controlled and the adjustment method (the blog from user), _ybbxk's architecture, learning garden).doc
- 高层建筑(High rise building).doc
- 高层建筑深基坑支护施工技术探讨(Discussion on construction technology of deep foundation pit support for high rise building).doc
- 高层设计省钱大法(Saving money for high-rise design).doc
- 高层钢结构施工技术与管理(Construction technology and management of high rise steel structure).doc
- 高层结构设计需要控制的七个比值及调整方法(转自user的博客)_ybbxk(The seven ratios that need to be controlled and the tuning method (_ybbxk blog transferred from user) for high-level structural design).doc
最近下载
- 《逆命题和逆定理》参考课件4.pptx VIP
- 2025年匹克球市场前景分析.docx
- SY 5490-2016 钻井液试验用土.pdf VIP
- 手术前焦虑恐惧的心理护理.pptx VIP
- 贵州铝业集团高校毕业生招聘笔试真题2025.docx VIP
- 2023年中国铝业集团有限公司华东区域法律中心法律顾问招聘考试真题及答案.docx VIP
- 2024中国铝业集团有限公司招聘1人笔试模拟试题及答案解析.docx VIP
- Q_SY 17348-2016 钻井液用页岩抑制剂聚合醇技术规范.pdf VIP
- 2024中国铝业集团有限公司招聘1人笔试备考试题及答案解析.docx VIP
- 2024中国铝业集团有限公司招聘1人笔试备考题库及答案解析.docx VIP
原创力文档

文档评论(0)